← Back to application

Proposal

Application for Full Planning Permission for replacement of the existing roof coverings from asphalt to a liquid-applied Kemper waterproofing system; installation of insulation to the barrel-vaulted nave roof (Roof A) and the high-level flat roof (Roof B); replacement of existing metal louvred bases to the 7x rooflights with insulated kerbs with secondary glazing below; increase in height of the existing roof in low-level areas, including the introduction of new overflows; formation of a new door opening on the west side of the tower to provide access from the vertical ladder onto the nave roof; removal of non-original white trunking from the north and south elevations; making good of stained glass windows, precast concrete window surrounds; high-level brickwork and copings; and repairs to the bell tower, including redecoration of the cross to its original decorative scheme.

Your comment matters: Submitting a representation helps planners understand community views and shapes the final decision.

Draft your email