← City of Westminster

Status

Pending Commercial
Received
30 Oct 2025
New homes
0

Full proposal

Alterations including; demolition and alteration to roof structure including the installation of mechanical plant to roof valley above and the provision of a new terrace and associates railing and access arrangement (sliding roof light) to the rear of the main roof, removal of fixed rooflight over central stair; removal of stair from third floor terrace to plant zone at main roof level; installation of replacement roof lights at main roof level; refurbishment of main entrance door, installation of replacement security camera system, alteration to the ground and lower ground floor fenestration facing Deans Mews and facing internal lightwell, installation of replacement windows and doors at rear ground fand first floor level facing Deans Mews elevation and within the internal lightwell, removal of render to lightwell, installation of replacement cover and railings to first floor terrace, installation of onsite greening. All in connection with the use of the lower ground, ground, first and second floor level as a not forprofit museum (Class F1) and use of the third floor as residential flat (Class C3).

Documents

251030 COVER LETTER
Background Papers
Not yet archived · Original link
ACK-GENERAL LETTER (G/P/C)
Background Papers
Not yet archived · Original link
APPLICATIONFORMREDACTED
Application Form
Not yet archived · Original link
BEDROOM SHOE STORAGE P05
Drawing
Not yet archived · Original link
BEDROOM WARDROBE P05
Drawing
Not yet archived · Original link
CNSLT-LA SOCIETY
Background Papers
Not yet archived · Original link
DAS PART 1
Design and Access Statement
Not yet archived · Original link
DAS PART 2
Design and Access Statement
Not yet archived · Original link
DAS PART 3
Design and Access Statement
Not yet archived · Original link
DAS PART 4
Design and Access Statement
Not yet archived · Original link
DAS PART 5
Design and Access Statement
Not yet archived · Original link
DEM FIRST FLOOR PLAN P05
Drawing
Not yet archived · Original link
DEM GROUND FLOOR PLAN P05
Drawing
Not yet archived · Original link
DEM LOWER GROUND FLOOR PLAN P05
Drawing
Not yet archived · Original link
DEM ROOF P05
Drawing
Not yet archived · Original link
DEM SECOND FLOOR PLAN P05
Drawing
Not yet archived · Original link
DEM SECTION A P05
Drawing
Not yet archived · Original link
DEM SECTION B P05
Drawing
Not yet archived · Original link
DEM SECTION C D P05
Drawing
Not yet archived · Original link
DEM SECTION E F P05
Drawing
Not yet archived · Original link
DEM SECTION G H P05
Drawing
Not yet archived · Original link
DEM SOUTH AND NORTH ELEVATION P05
Drawing
Not yet archived · Original link
DEM THIRD FLOOR PLAN P05
Drawing
Not yet archived · Original link
ECNSLT-INTERNAL CONSULTS
Background Papers
Not yet archived · Original link
ECNSLT-INTERNAL CONSULTS
Background Papers
Not yet archived · Original link
ENSUITE VANITY UNIT P05
Drawing
Not yet archived · Original link
EX DEANS MEWS ELEVATION P05
Drawing
Not yet archived · Original link
EX FIRST FLOOR PLAN P05
Drawing
Not yet archived · Original link
EX GROUND FLOOR PLAN P05
Drawing
Not yet archived · Original link
EX LOWER GROUND FLOOR PLAN P05
Drawing
Not yet archived · Original link
EX ROOF P05
Drawing
Not yet archived · Original link
EX SECOND FLOOR PLAN P05
Drawing
Not yet archived · Original link
EX SECTION A P05
Drawing
Not yet archived · Original link
EX SECTION B P05
Drawing
Not yet archived · Original link
EX SECTION C D P05
Drawing
Not yet archived · Original link
EX SECTION E F P05
Drawing
Not yet archived · Original link
EX SECTION G H P05
Drawing
Not yet archived · Original link
Drawing
Archived · Original link
EX SOUTH AND NORTH ELEVATION P05
Drawing
Not yet archived · Original link
EX THIRD FLOOR PLAN P05
Drawing
Not yet archived · Original link
FCU CUPBOARD P05
Drawing
Not yet archived · Original link
FCU ENCASEMENT P05
Drawing
Not yet archived · Original link
FCU ENCASEMENT P05
Drawing
Not yet archived · Original link
HALLWAY COAT CUPBOARD P05
Drawing
Not yet archived · Original link
HERITAGE STATEMENT
Heritage Statement
Not yet archived · Original link
KITCHEN BACK COUNTER P05
Drawing
Not yet archived · Original link
KITCHEN ISLAND P05
Drawing
Not yet archived · Original link
LIFT CONTROL BELOW STAIR CUPBOARD P05
Drawing
Not yet archived · Original link
LOBBY SWITCH PANEL P05
Drawing
Not yet archived · Original link
LOCATION PLAN
Location Plan
Not yet archived · Original link
MEDIA UNIT WITH FCU ENCASEMENT P05
Drawing
Not yet archived · Original link
NEIGHBOUR NOTIFICATION LETTER (21D)
Background Papers
Not yet archived · Original link
NOISE ASSESSMENT
Background Papers
Not yet archived · Original link
PLANNING STATEMENT
Background Papers
Not yet archived · Original link
PR 1F ROOF DETAILS P05
Drawing
Not yet archived · Original link
PR CEILING TYPES OVERVIEW P05
Drawing
Not yet archived · Original link
PR CEILING TYPES P05
Drawing
Not yet archived · Original link
PR DEANS MEWS ELEVATION P05
Drawing
Not yet archived · Original link
PR EXT DOOR ED 03 02 P05
Drawing
Not yet archived · Original link
PR EXT DOOR ED 03 03 P05
Drawing
Not yet archived · Original link
PR EXT DOOR ED G 01 P05
Drawing
Not yet archived · Original link
PR EXT DOOR ED LG 01 P05
Drawing
Not yet archived · Original link
PR EXT DOOR ED LG 05 P05
Drawing
Not yet archived · Original link
PR EXT DOOR TYPE 01 P05
Drawing
Not yet archived · Original link
PR EXT DOOR TYPE 02 P05
Drawing
Not yet archived · Original link
PR EXT WINDOW EW 03 01 P05
Drawing
Not yet archived · Original link
PR EXT WINDOW EW G 06 P05
Drawing
Not yet archived · Original link
PR EXT WINDOW TYPE 01 P05
Drawing
Not yet archived · Original link
PR EXT WINDOW TYPE 02 P05
Drawing
Not yet archived · Original link
PR EXT WINDOW TYPE 03 P05
Drawing
Not yet archived · Original link
PR EXT WINDOW TYPE 04 P05
Drawing
Not yet archived · Original link
PR EXT WINDOW TYPE 05 P05
Drawing
Not yet archived · Original link
PR EXTERNAL WALL TYPES P05
Drawing
Not yet archived · Original link
PR FIRE CURTAIN TYPE 01 P05
Drawing
Not yet archived · Original link
PR FIRST FLOOR DRAINAGE P05
Drawing
Not yet archived · Original link
PR FIRST FLOOR FIRE STRATEGY P05
Drawing
Not yet archived · Original link
PR FIRST FLOOR PLAN P05
Drawing
Not yet archived · Original link
PR FLOOR TYPES OVERVIEW P05
Drawing
Not yet archived · Original link
PR FLOOR TYPES P05
Drawing
Not yet archived · Original link
PR GROUND FLOOR DRAINAGE P05
Drawing
Not yet archived · Original link
PR GROUND FLOOR FIRE STRATEGY P05
Drawing
Not yet archived · Original link
PR GROUND FLOOR PLAN P05
Drawing
Not yet archived · Original link
PR INT DOOR ID 02 02 P05
Drawing
Not yet archived · Original link
PR INT DOOR ID 03 01 P05
Drawing
Not yet archived · Original link
PR INT DOOR ID 03 02 P05
Drawing
Not yet archived · Original link
PR INT DOOR ID 03 03 P05
Drawing
Not yet archived · Original link
PR INT DOOR ID G 06 P05
Drawing
Not yet archived · Original link
PR INT DOOR ID G 07 P05
Drawing
Not yet archived · Original link
PR INT DOOR ID LG 01 P05
Drawing
Not yet archived · Original link
PR INT DOOR ID LG 02 P05
Drawing
Not yet archived · Original link
PR INT DOOR ID LG 03 P05
Drawing
Not yet archived · Original link
PR INT DOOR ID LG 04 P05
Drawing
Not yet archived · Original link
PR INT DOOR ID LG 05 P05
Drawing
Not yet archived · Original link
PR INT DOOR ID LG 06 P05
Drawing
Not yet archived · Original link
PR INT DOOR ID LG 07 P05
Drawing
Not yet archived · Original link
PR INT DOOR TYPE 01 P05
Drawing
Not yet archived · Original link
PR INTERNAL WALL AND LINING TYPES P05
Drawing
Not yet archived · Original link
PR J G 01 J 01 01 J 02 01 RISER CUPBOARD P05
Drawing
Not yet archived · Original link
PR J G 02 03 J 01 02 03 04 J 02 02 03 04 FCU ENCASEMENT P05
Drawing
Not yet archived · Original link
PR J G 07 08 J 01 06 CEILING ACCESS PANELS P05
Drawing
Not yet archived · Original link
PR J LG 01 ARCHIVE PLANT CUPBOARD P05
Drawing
Not yet archived · Original link
PR J LG 02 AND 03 FCU ENCASEMENT P05
Drawing
Not yet archived · Original link
PR J LG 10 AND 11 FCU ENCASEMENT AND SHELVING P05
Drawing
Not yet archived · Original link
PR J LG 12 REFUSE PLATFORM P05
Drawing
Not yet archived · Original link
PR J LG 14 BELOW STAIR CUPBOARDS P05
Drawing
Not yet archived · Original link
PR J LG 15 BELOW STAIR CUPBOARD P05
Drawing
Not yet archived · Original link
PR J LG 16 FRONT LIGHTWELL CUPBOARD P05
Drawing
Not yet archived · Original link
PR J LG-09 TEAPOINT UNITS P05
Drawing
Not yet archived · Original link
PR LOWER GROUND FLOOR DRAINAGE P05
Drawing
Not yet archived · Original link
PR LOWER GROUND FLOOR FIRE STRATEGY P05
Drawing
Not yet archived · Original link
PR LOWER GROUND FLOOR PLAN P05
Drawing
Not yet archived · Original link
PR RCP FIRST FLOOR FLOOR P05
Drawing
Not yet archived · Original link
PR RCP GROUND FLOOR P05
Drawing
Not yet archived · Original link
PR RCP LOWER GROUND FLOOR P05
Drawing
Not yet archived · Original link
PR RCP SECOND FLOOR P05
Drawing
Not yet archived · Original link
PR RCP THIRD FLOOR P05
Drawing
Not yet archived · Original link
PR RF ALTERATIONS AND TERRACE DETAILS 1 OF 2 P05
Drawing
Not yet archived · Original link
PR RF ALTERATIONS AND TERRACE DETAILS 2 OF 2 P05
Drawing
Not yet archived · Original link
PR RF FRONT ROOF ALTERATIONS AND COURTYARD TERRACE P05
Drawing
Not yet archived · Original link
PR ROOF DRAINAGE P05
Drawing
Not yet archived · Original link
PR ROOF FIRE STRATEGY P05
Drawing
Not yet archived · Original link
PR ROOF P05
Drawing
Not yet archived · Original link
PR ROOF SIGHTLINES STUDY P05
Drawing
Not yet archived · Original link
PR ROOF TYPES OVERVIEW P05
Drawing
Not yet archived · Original link
PR ROOF TYPES P05
Drawing
Not yet archived · Original link
PR ROOFLIGHT RL 03 01 P05
Drawing
Not yet archived · Original link
PR ROOFLIGHT RL 04 01 P05
Drawing
Not yet archived · Original link
PR ROOFLIGHT RL 04 02P05
Drawing
Not yet archived · Original link
PR ROOFLIGHT RL 04 03 AND RL 04 04 P05
Drawing
Not yet archived · Original link
PR SECOND FLOOR DRAINAGE P05
Drawing
Not yet archived · Original link
PR SECOND FLOOR FIRE STRATEGY P05
Drawing
Not yet archived · Original link
PR SECOND FLOOR PLAN P05
Drawing
Not yet archived · Original link
PR SECTION A P05
Drawing
Not yet archived · Original link
PR SECTION B P05
Drawing
Not yet archived · Original link
PR SECTION C COMPARISON P05
Drawing
Not yet archived · Original link
PR SECTION C D P05
Drawing
Not yet archived · Original link
PR SECTION E F P05
Drawing
Not yet archived · Original link
PR SECTION G H P05
Drawing
Not yet archived · Original link
PR SOUTH AND NORTH ELEVATION P05
Drawing
Not yet archived · Original link
PR THIRD FLOOR DRAINAGE P05
Drawing
Not yet archived · Original link
PR THIRD FLOOR FIRE STRATEGY P05
Drawing
Not yet archived · Original link
PR THIRD FLOOR PLAN P05
Drawing
Not yet archived · Original link
PR WALL TYPES OVERVIEW P05
Drawing
Not yet archived · Original link
RECEIPT OF APPLICATION
Other
Not yet archived · Original link
SERVICE HALLWAY CUPBOARD P05
Drawing
Not yet archived · Original link
SITE NOTICE 21 OR 28 DAYS IF T&C APPL.
Background Papers
Not yet archived · Original link
URBAN GREENING FACTOR
Background Papers
Not yet archived · Original link

Have your say

Your comment matters. Councils must consider every representation that raises material planning considerations.

Write a comment