← Back to Tower Hamlets
Status
Registered
New housing
Received
n/a
New dwellings
62
What you can do
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.
Summary
Redevelopment providing 918 student bedspaces and 62 social rented homes with public realm.
Full Proposal
Redevelopment of the site to include demolition of existing buildings and associated site clearance and erection of buildings and extension to the existing basement to provide student accommodation (Sui Generis), residential uses (Use Class C3), flexible community/commercial use (Use Classes E, F1(e), F2(b)), public realm, landscaping, car and cycle parking, highways works and associated works. This application is accompanied by an Environmental Impact Assessment. Summary of Proposals for the Purpose of Public Consultation but does not form part of the Description of Development Construction of three buildings comprising of Block A (28 storeys, 91.03m AOD); Block B (14 storeys, 53.45m AOD) and Block C (28 Storeys, 89.90m AOD); to provide 918 student bedspaces and 62 social rented affordable homes. 4,260 m2 of public realm and open space including 880 m2 play space Affordable community incubator space measuring 172.5 m2 (GIA) at ground floor of Block A. This use will be flexible to provide space for the local community A total of two on-street disabled car parking spaces to be provided for residential use and four drop-off car parking spaces in the basement to assist with students moving in and out A total of 837 cycle parking spaces including 809 long-stay provided in the basement and 28 short stay provided in the public realm. The proposed Development comprises up to 40,990.2 m² (GIA), which includes; 31,632 m² (GIA) PBSA (Sui Generis) 6,635.7 m² (GIA) Residential Use (Use Class C3) 172.5 m² (GIA) Affordable Community Incubator Space (Use Classes E, F1(e), F2(b)) 2,550 m² (GIA) Car Park
Documents
ACTIVE TRAVEL ENGLAND
Consultee Comment
ADDENDUM
Design & Access Statement
ADDENDUM
Planning Statement
ADDENDUM
Design & Access Statement
ADDENDUM
Planning Statement
ADDENDUM - COMBINED FIGURES
Environmental Statement
ADDENDUM - PART 1
Design & Access Statement
ADDENDUM - PART 1
Environmental Statement
ADDENDUM - PART 2
Environmental Statement
ADDENDUM - PART 2
Design & Access Statement
AFFORDABLE HOUSING STATEMENT
Report
APPENDICES
Planning Statement
APPENDIX A
Design & Access Statement
APPLICATION DRAWING SCHEDULE - NOV 2025
Drawing/Document Issue Register
Application Form
Application Form
APPLICATON DRAWING SCHEDULE
Drawing/Document Issue Register
ARBORICULTURE IMPACT ASSESSMENT
Report
AVIATION SAFEGUARDING ASSESSMENT
Report
BASEMENT COMBINED MEP PLANT REQUIREMENTS LAYOUT
Current Plan
BASEMENT ENERGY CENTRE LAYOUT
Current Plan
BIODIVERSITY NET GAIN & URBAN GREENING FACTOR ASSESSMENTS
Report
BIODIVERSITY NET GAIN MAP
Correspondence
BIODIVERSITY NET GAIN METRIC
Report
BLOCK A - PROPOSED LEVEL 02 - 12 PLAN
Current Plan
BLOCK A MECHANICAL AND ELECTRICAL TYPICAL FLOOR LAYOUT
Current Plan
BLOCK A PROPOSED TOP ROOF PLAN
Current Plan
BLOCK A ROOF LEVEL PIPEWORK LAYOUT
Current Plan
BLOCK A_BAY STUDIES CROWN WEST
Current Plan
BLOCK A_BAY STUDIES CROWN WEST
Current Plan
BLOCK A_BAY STUDIES ENTRANCE SOUTH
Current Plan
BLOCK A_BAY STUDIES ENTRANCE SOUTH
Current Plan
BLOCK A_BAY STUDIES GROUND WEST
Current Plan
BLOCK A_BAY STUDIES GROUND WEST
Current Plan
BLOCK A_BAY STUDIES TYPICAL WEST
Current Plan
BLOCK A_BAY STUDIES TYPICAL WEST
Current Plan
BLOCK A_PROPOSED LEVEL 00 PLAN
Current Plan
BLOCK A_PROPOSED LEVEL 00 PLAN
Current Plan
BLOCK A_PROPOSED LEVEL 01 PLAN
Current Plan
BLOCK A_PROPOSED LEVEL 01 PLAN
Current Plan
BLOCK A_PROPOSED LEVEL 02 - 12 PLAN
Current Plan
BLOCK A_PROPOSED LEVEL 13 - 26 PLAN
Current Plan
BLOCK A_PROPOSED LEVEL 13 - 26 PLAN
Current Plan
BLOCK A_PROPOSED LEVEL 27 PLAN
Current Plan
BLOCK A_PROPOSED LEVEL 27 PLAN
Current Plan
BLOCK A_PROPOSED NORTH & EAST ELEVATIONS
Current Plan
BLOCK A_PROPOSED NORTH AND EAST ELEVATIONS
Current Plan
BLOCK A_PROPOSED ROOF PLAN
Current Plan
BLOCK A_PROPOSED ROOF PLAN
Current Plan
BLOCK A_PROPOSED SECTIONS
Current Plan
BLOCK A_PROPOSED SECTIONS
Current Plan
BLOCK A_PROPOSED SOUTH & WEST ELEVATIONS
Current Plan
BLOCK A_PROPOSED SOUTH AND WEST ELEVATIONS
Current Plan
BLOCK A_PROPOSED TOP ROOF PLAN
Current Plan
BLOCK B - PROPOSED LEVEL 01 - 03 PLAN
Current Plan
BLOCK B - PROPOSED LEVEL 04 - 13 PLAN
Current Plan
BLOCK B MECHANICAL AND ELECTRICAL TYPICAL FLOOR LAYOUT
Current Plan
BLOCK B PROPOSED LEVEL 01 - 03 PLAN
Current Plan
BLOCK B PROPOSED LEVEL 04 - 06 PLAN
Current Plan
BLOCK B PROPOSED LEVEL 07 - 13
Current Plan
BLOCK B PROPOSED NORTH & EAST ELEVATIONS
Current Plan
BLOCK B PROPOSED ROOF PLAN
Current Plan
BLOCK B ROOF LEVEL PIPEWORK LAYOUT
Current Plan
BLOCK B_BAY STUDIES COMMERCIAL ENTRANCE
Current Plan
BLOCK B_BAY STUDIES CROWN SOUTH
Current Plan
BLOCK B_BAY STUDIES CROWN SOUTH
Current Plan
BLOCK B_BAY STUDIES ENTRANCE WEST
Current Plan
BLOCK B_BAY STUDIES GROUND SOUTH
Current Plan
BLOCK B_BAY STUDIES GROUND SOUTH
Current Plan
BLOCK B_BAY STUDIES RESI ENTRANCE EAST
Current Plan
BLOCK B_BAY STUDIES TYPICAL SOUTH
Current Plan
BLOCK B_BAY STUDIES TYPICAL SOUTH
Current Plan
BLOCK B_PROPOSED LEVEL 00 PLAN
Current Plan
BLOCK B_PROPOSED LEVEL 01 - 03 PLAN
Current Plan
BLOCK B_PROPOSED LEVEL 04 - 13 PLAN
Current Plan
BLOCK B_PROPOSED MEZZANINE PLAN
Current Plan
BLOCK B_PROPOSED NORTH & EAST ELEVATIONS
Current Plan
BLOCK B_PROPOSED NORTH AND EAST ELEVATIONS
Current Plan
BLOCK B_PROPOSED ROOF PLAN
Current Plan
BLOCK B_PROPOSED SECTIONS
Current Plan
BLOCK B_PROPOSED SECTIONS
Current Plan
BLOCK B_PROPOSED SOUTH & WEST ELEVATIONS
Current Plan
BLOCK B_PROPOSED SOUTH AND WEST ELEVATIONS
Current Plan
BLOCK B_PROPOSED TOP ROOF PLAN
Current Plan
BLOCK B_PROPOSED TOP ROOF PLAN
Current Plan
BLOCK C - PROPOSED LEVEL 02 - 06 PLAN
Current Plan
BLOCK C - PROPOSED LEVEL 10 - 27 PLAN
Current Plan
BLOCK C ROOF LEVEL PIPEWORK LAYOUT
Current Plan
BLOCK C_BAY STUDIES BASE NORTH
Current Plan
BLOCK C_BAY STUDIES BASE NORTH
Current Plan
BLOCK C_BAY STUDIES CROWN NORTH
Current Plan
BLOCK C_BAY STUDIES CROWN NORTH
Current Plan
BLOCK C_BAY STUDIES CROWN WEST
Current Plan
BLOCK C_BAY STUDIES CROWN WEST
Current Plan
BLOCK C_BAY STUDIES GROUND WEST
Current Plan
BLOCK C_BAY STUDIES GROUND WEST
Current Plan
BLOCK C_BAY STUDIES TYPICAL WEST
Current Plan
BLOCK C_BAY STUDIES TYPICAL WEST
Current Plan
BLOCK C_PROPOSED LEVEL 00 PLAN
Current Plan
BLOCK C_PROPOSED LEVEL 00 PLAN
Current Plan
BLOCK C_PROPOSED LEVEL 01 PLAN
Current Plan
BLOCK C_PROPOSED LEVEL 01 PLAN
Current Plan
BLOCK C_PROPOSED LEVEL 02 - 06 PLAN
Current Plan
BLOCK C_PROPOSED LEVEL 07 - 09 PLAN
Current Plan
BLOCK C_PROPOSED LEVEL 07 - 09 PLAN
Current Plan
BLOCK C_PROPOSED LEVEL 10-27 PLAN
Current Plan
BLOCK C_PROPOSED NORTH & EAST ELEVATIONS
Current Plan
BLOCK C_PROPOSED NORTH AND EAST ELEVATIONS
Current Plan
BLOCK C_PROPOSED ROOF PLAN
Current Plan
BLOCK C_PROPOSED ROOF PLAN
Current Plan
BLOCK C_PROPOSED SECTIONS
Current Plan
BLOCK C_PROPOSED SECTIONS
Current Plan
BLOCK C_PROPOSED SOUTH & WEST ELEVATIONS
Current Plan
BLOCK C_PROPOSED SOUTH AND WEST ELEVATIONS
Current Plan
BLOCK C_PROPOSED TOP ROOF PLAN
Current Plan
BLOCK C_PROPOSED TOP ROOF PLAN
Current Plan
CADENT GAS LTD
Consultee Comment
CHAPTER 1
Design & Access Statement
CHAPTER 10A
Design & Access Statement
CHAPTER 10B
Design & Access Statement
CHAPTER 10C
Design & Access Statement
CHAPTER 10D
Design & Access Statement
CHAPTER 2A
Design & Access Statement
CHAPTER 2B
Design & Access Statement
CHAPTER 2C
Design & Access Statement
CHAPTER 3A
Design & Access Statement
CHAPTER 3B
Design & Access Statement
CHAPTER 3C
Design & Access Statement
CHAPTER 4A
Design & Access Statement
CHAPTER 4B
Design & Access Statement
CHAPTER 4C
Design & Access Statement
CHAPTER 4D
Design & Access Statement
CHAPTER 5A
Design & Access Statement
CHAPTER 5B
Design & Access Statement
CHAPTER 5C
Design & Access Statement
CHAPTER 6
Design & Access Statement
CHAPTER 7
Design & Access Statement
CHAPTER 8A
Design & Access Statement
CHAPTER 8B
Design & Access Statement
CHAPTER 9
Design & Access Statement
CIRCULAR ECONOMY STATEMENT GLA TEMPLATE
Correspondence
CIRCULAR ECONOMY STATEMENT VOLUME 1: PRE- REDEVELOPMENT AUDIT
Report
CIRCULAR ECONOMY STATEMENT VOLUME 2: PRE-DEMOLITION AUDIT
Report
COVERING LETTER - 21.11.2025
Correspondence
COVERING LETTER - 23.01.2026
Correspondence
COVERING LETTER DATED: 26 JUNE 2025
Correspondence
DELIVERY AND SERVICING PLAN
Report
DEMOLITION BASEMENT PLAN
Current Plan
DEMOLITION ELEVATIONS AND SECTIONS 01
Current Plan
DEMOLITION ELEVATIONS AND SECTIONS 02
Current Plan
DEMOLITION LEVEL 00 PLAN
Current Plan
DEMOLITION LEVEL 01 PLAN
Current Plan
DEMOLITION LEVEL 02 PLAN
Current Plan
DEMOLITION LEVEL 03 PLAN
Current Plan
DEMOLITION ROOF PLAN
Current Plan
DRAWING SCHEDULE REV 01
Drawing/Document Issue Register
ECOLOGY REVIEW FROM TEMPLE
Report
ECONOMIC BENEFITS STATEMENT
Report
EIA REGULATION 25 REQUEST
Correspondence
EMAIL DATED 05 NOV 2025
Correspondence
EMAIL FROM HISTORIC ENGLAND, DATED 26/08/2025
Correspondence
ENERGY ASSESSMENT: TM54 OPERATIONAL ASSESSMENT (BLOCK A)
Report
ENERGY ASSESSMENT: TM54 OPERATIONAL ASSESSMENT (BLOCK B)
Report
ENERGY ASSESSMENT: TM54 OPERATIONAL ASSESSMENT (BLOCK C)
Report
ENERGY STRATEGY - APPENDIX X - BRUKL RESULTS
Report
ENERGY STRATEGY - APPENDIX Y - SAPS
Report
ENERGY STRATEGY - APPENDIX Z - OVERHEATING RESULTS
Report
ENERGY STRATEGY REPORT
Report
ENVIRONMENT AGENCY
Consultee Comment
EXISTING BASEMENT PLAN
Current Plan
EXISTING ELEVATIONS AND SECTIONS 01
Current Plan
EXISTING ELEVATIONS AND SECTIONS 02
Current Plan
EXISTING LEVEL 00 PLAN
Current Plan
EXISTING LEVEL 01 PLAN
Current Plan
EXISTING LEVEL 02 PLAN
Current Plan
EXISTING LEVEL 03 PLAN
Current Plan
EXISTING ROOF PLAN
Current Plan
FINANCIAL VIABILITY ASSESSMENT
Report
FIRE STATEMENT (LONDON PLAN)
Report
FRAMEWORK RESIDENTIAL TRAVEL PLAN
Report
FRAMEWORK STUDENT TRAVEL PLAN
Report
GLA - ACKNOWLEDGEMENT
Consultee Comment
GLA CARBON EMISSIONS REPORTING SPREADSHEET
Report
GLA STAGE 1 LETTER
Correspondence
GLA STAGE 1 REPORT
Correspondence
HEALTH IMPACT ASSESSMENT
Report
HISTORIC ENGLAND
Consultee Comment
HISTORIC ENGLAND GLAAS
Consultee Comment
INFRASTRUCTURE IMPACT ASSESSMENT
Report
INTERIM REVIEW REPORT
Report
INTERNAL DAYLIGHT, SUNLIGHT & SHADING
Daylight & Sunlight
INTERNAL DAYLIGHT, SUNLIGHT & SHADING ADDENDUM
Daylight & Sunlight
IRR PROPOSED RESPONSES
Report
LBTH BIODIVERSITY NET GAIN (BNG) CHECKLIST
Correspondence
LBTH BIODIVERSITY REVIEWS
Correspondence
LBTH ES REVIEW ? INTERIM REVIEW REPORT
Correspondence
LETTER FROM EB7
Correspondence
LETTER OF SUPPORT FROM LSE DATED: 06 MAY 2025
Correspondence
LONDON CITY AIRPORT
Consultee Comment
LONDON UNDERGROUND
Consultee Comment
MASTERPLAN PROPOSED LEVEL 01 PLAN
Current Plan
MASTERPLAN PROPOSED TYPICAL LOWER PLAN
Current Plan
MASTERPLAN PROPOSED TYPICAL MID PLAN
Current Plan
MASTERPLAN_PROPOSED BASEMENT FLOOR PLAN
Current Plan
MASTERPLAN_PROPOSED BASEMENT FLOOR PLAN
Current Plan
MASTERPLAN_PROPOSED EAST ELEVATION
Current Plan
MASTERPLAN_PROPOSED EAST ELEVATION
Current Plan
MASTERPLAN_PROPOSED EAST WEST SECTION
Current Plan
MASTERPLAN_PROPOSED EAST WEST SECTION
Current Plan
MASTERPLAN_PROPOSED LEVEL 00 PLAN
Current Plan
MASTERPLAN_PROPOSED LEVEL 00 PLAN
Current Plan
MASTERPLAN_PROPOSED LEVEL 01 PLAN
Current Plan
MASTERPLAN_PROPOSED LEVEL 01 PLAN
Current Plan
MASTERPLAN_PROPOSED LEVEL 14 PLAN
Current Plan
MASTERPLAN_PROPOSED LEVEL 14 PLAN
Current Plan
MASTERPLAN_PROPOSED LEVEL 27 PLAN
Current Plan
MASTERPLAN_PROPOSED LEVEL 27 PLAN
Current Plan
MASTERPLAN_PROPOSED NORTH ELEVATION
Current Plan
MASTERPLAN_PROPOSED NORTH ELEVATION
Current Plan
MASTERPLAN_PROPOSED NORTH SOUTH SECTION
Current Plan
MASTERPLAN_PROPOSED NORTH SOUTH SECTION
Current Plan
MASTERPLAN_PROPOSED ROOF PLAN
Current Plan
MASTERPLAN_PROPOSED ROOF PLAN
Current Plan
MASTERPLAN_PROPOSED TOP ROOF PLAN
Current Plan
MASTERPLAN_PROPOSED TOP ROOF PLAN
Current Plan
MASTERPLAN_PROPOSED TYPICAL LOWER PLAN
Current Plan
MASTERPLAN_PROPOSED TYPICAL LOWER PLAN
Current Plan
MASTERPLAN_PROPOSED TYPICAL MID PLAN
Current Plan
MASTERPLAN_PROPOSED TYPICAL MID PLAN
Current Plan
MASTERPLAN_PROPOSED TYPICAL UPPER PLAN
Current Plan
MASTERPLAN_PROPOSED TYPICAL UPPER PLAN
Current Plan
MASTERPLAN_PROPOSED WEST ELEVATIONS
Current Plan
MASTERPLAN_PROPOSED WEST ELEVATIONS
Current Plan
MATERPLAN_PROPOSED SOUTH ELEVATION
Current Plan
MATERPLAN_PROPOSED SOUTH ELEVATION
Current Plan
MHB SUBMITTED DOCUMENTS AND PLANS TRACKER V4
Drawing/Document Issue Register
NATURAL ENGLAND
Consultee Comment
NOTE IN RESPONSE TO COMMENTS BY TFL & GLA
Correspondence
OUTLINE CONSTRUCTION LOGISTICS PLAN
Report
PARKING DESIGN AND MANAGEMENT PLAN
Report
PBSA DEMAND AND MARKET ASSESSMENT
Report
PLANNING GATEWAY ONE FIRE STATEMENT
Report
PLANNING NOISE ASSESSMENT OF RESIDENTIAL AMENITY
Report
Planning Statement
Planning Statement
PORT OF LONDON AUTHORITY (PLA)
Consultee Comment
PRELIMINARY ECOLOGICAL APPRAISAL
Report
PRELIMINARY ECOLOGICAL APPRAISAL MAP
Correspondence
PROPOSED AREA & ACCOMMODATION SCHEDULE
Correspondence
PROPOSED HARD LANDSCAPE STRATEGY - PEDESTRIAN CROSSING
Current Plan
PROPOSED HARD LANDSCAPE STRATEGY - PEDESTRIAN CROSSING
Current Plan
PROPOSED HARD SURFACES AND FURNITURE STRATEGY - GROUND LEVEL 1 OF 4
Current Plan
PROPOSED HARD SURFACES AND FURNITURE STRATEGY - GROUND LEVEL 2 OF 4
Current Plan
PROPOSED HARD SURFACES AND FURNITURE STRATEGY - GROUND LEVEL 3 OF 4
Current Plan
PROPOSED HARD SURFACES AND FURNITURE STRATEGY - GROUND LEVEL 4 OF 4
Current Plan
PROPOSED HARD SURFACES AND FURNITURE STRATEGY - GROUND LEVEL GA
Current Plan
PROPOSED HARD SURFACING AND FURNITURE - GROUND LEVEL 1 OF 4
Current Plan
PROPOSED HARD SURFACING AND FURNITURE - GROUND LEVEL 1 OF 4
Current Plan
PROPOSED HARD SURFACING AND FURNITURE - GROUND LEVEL 2 OF 4
Current Plan
PROPOSED HARD SURFACING AND FURNITURE - GROUND LEVEL 2 OF 4
Current Plan
PROPOSED HARD SURFACING AND FURNITURE - GROUND LEVEL 3 OF 4
Current Plan
PROPOSED HARD SURFACING AND FURNITURE - GROUND LEVEL 3 OF 4
Current Plan
PROPOSED HARD SURFACING AND FURNITURE - GROUND LEVEL 4 OF 4
Current Plan
PROPOSED HARD SURFACING AND FURNITURE - GROUND LEVEL 4 OF 4
Current Plan
PROPOSED HARD SURFACING AND FURNITURE - GROUND LEVEL GA
Current Plan
PROPOSED HARD SURFACING AND FURNITURE - GROUND LEVEL GA
Current Plan
PROPOSED LANDSCAPE LEVELS - GROUND LEVEL
Current Plan
PROPOSED LANDSCAPE LEVELS - GROUND LEVEL
Current Plan
PROPOSED LANDSCAPE LEVELS - GROUND LEVEL
Current Plan
PROPOSED LANDSCAPE MASTERPLAN - GROUND LEVEL
Current Plan
PROPOSED LANDSCAPE MASTERPLAN - GROUND LEVEL
Current Plan
PROPOSED LANDSCAPE MASTERPLAN - GROUND LEVEL
Current Plan
PROPOSED LANDSCAPE STRATEGY - FIRST FLOOR
Current Plan
PROPOSED LANDSCAPE STRATEGY - ROOF
Current Plan
PROPOSED LANDSCAPE STRATEGY - ROOF LEVEL
Current Plan
PROPOSED LEVEL 00 PLAN
Current Plan
PROPOSED LEVEL 00 PLAN
Current Plan
PROPOSED LEVEL 01 PLAN
Current Plan
PROPOSED LEVEL 14 PLAN
Current Plan
PROPOSED LEVEL 27 PLAN
Current Plan
PROPOSED NORTHERN PLAY AREA
Current Plan
PROPOSED NORTHERN PLAY AREA
Current Plan
PROPOSED NORTHERN PLAY AREA
Current Plan
PROPOSED PLANTING - FIRST FLOOR1 OF 1
Current Plan
PROPOSED PLANTING - GROUND LEVEL 1 OF 4
Current Plan
PROPOSED PLANTING - GROUND LEVEL 1 OF 4
Current Plan
PROPOSED PLANTING - GROUND LEVEL 1 OF 4
Current Plan
PROPOSED PLANTING - GROUND LEVEL 2 OF 4
Current Plan
PROPOSED PLANTING - GROUND LEVEL 2 OF 4
Current Plan
PROPOSED PLANTING - GROUND LEVEL 2 OF 4
Current Plan
PROPOSED PLANTING - GROUND LEVEL 3 OF 4
Current Plan
PROPOSED PLANTING - GROUND LEVEL 3 OF 4
Current Plan
PROPOSED PLANTING - GROUND LEVEL 3 OF 4
Current Plan
PROPOSED PLANTING - GROUND LEVEL 4 OF 4
Current Plan
PROPOSED PLANTING - GROUND LEVEL 4 OF 4
Current Plan
PROPOSED PLANTING - GROUND LEVEL 4 OF 4
Current Plan
PROPOSED PLANTING - ROOF 1 OF 1
Current Plan
PROPOSED PLANTING - ROOF LEVEL 1 OF 1
Current Plan
PROPOSED PLANTING STRATEGY - GROUND LEVEL GA
Current Plan
PROPOSED PLANTING STRATEGY - GROUND LEVEL GA
Current Plan
PROPOSED PLANTING STRATEGY - GROUND LEVEL GA
Current Plan
PROPOSED ROOF PLAN
Current Plan
PROPOSED SECTION A
Current Plan
PROPOSED SECTION B
Current Plan
PROPOSED SECTION B
Current Plan
PROPOSED SECTION B
Current Plan
PROPOSED SECTION C
Current Plan
PROPOSED SECTION C
Current Plan
PROPOSED SECTION C
Current Plan
PROPOSED SOUTHERN PLAY AREA
Current Plan
PROPOSED SOUTHERN PLAY AREA
Current Plan
PROPOSED SOUTHERN PLAY AREA
Current Plan
PROPOSED TOP ROOF PLAN
Current Plan
PROPOSED TYPICAL LOWER PLAN
Current Plan
PROPOSED TYPICAL MID PLAN
Current Plan
PROPOSED TYPICAL UPPER PLAN
Current Plan
RAMBOLL ES FINAL REVIEW
Report
RESPONSE TO TFL AND GLA
Correspondence
REV 05
Drawing/Document Issue Register
REV 05
Drawing/Document Issue Register
REVIEW REPORT
Daylight & Sunlight
SCHEDULE OF ACCOMMODATION
Correspondence
STATEMENT OF COMMUNITY INVOLVEMENT
Report
STUDENT MANAGEMENT PLAN
Report
SUBMITTED DOCS AND PLANS TEMPLATE V3
Drawing/Document Issue Register
SUSTAINABILITY STATEMENT (INC. BREEAM PRE-ASSESSMENT)
Report
SUSTAINABILITY STATEMENT ADDENDUM
Report
TECHNICAL NOTE - RESPONSE TO COMMENTS FROM EH 14.08.25
Correspondence
TECHNICAL NOTE - RESPONSE TO EHO
Correspondence
TECHNICAL NOTE - RESPONSE TO ENVIRONMENTAL HEALTH OFFICER (EHO)
Correspondence
TFL CONSULTEE COMMENTS DATED 07/11/2025
Consultee Comment
UK POWER NETWORKS
Consultee Comment
UPDATED NON-TECHNICAL SUMMARY
Environmental Statement
UPDATED TFL CONSULTEE COMMENTS, DATED 10/11/2025
Consultee Comment
URBAN GREENING FACTOR CALCULATOR
Report
USE OF THE TIDAL THAMES A PRACTICAL GUIDE FOR LOCAL AUTHORITIES AND DEVELOPERS
Correspondence
VOL 1 CH 1 INTRODUCTION
Environmental Statement
VOL 1 CH 10 NOISE AND VIBRATION
Environmental Statement
VOL 1 CH 11 ARCHAEOLOGY
Environmental Statement
VOL 1 CH 12 GROUND CONDITIONS AND CONTAMINATION
Environmental Statement
VOL 1 CH 13 WATER RESOURCES FLOOD RISK AND DRAINAGE
Environmental Statement
VOL 1 CH 14 DSO
Environmental Statement
VOL 1 CH 15 WIND
Environmental Statement
VOL 1 CH 16 GREENHOUSE GAS AND CLIMATE CHANGE
Environmental Statement
VOL 1 CH 17 HUMAN HEALTH
Environmental Statement
VOL 1 CH 18 CUMULATIVE SCHEMES
Environmental Statement
VOL 1 CH 19 NEXT STEPS
Environmental Statement
VOL 1 CH 2 EIA METHODOLOGY
Environmental Statement
VOL 1 CH 3 LAND USES AND SENSITIVE RECEPTORS
Environmental Statement
VOL 1 CH 4 THE PROPOSED DEVELOPMENT
Environmental Statement
VOL 1 CH 5 ALTERNATIVES AND DESIGN EVOLUTION
Environmental Statement
VOL 1 CH 6 CONSTRUCTION STRATEGY AND MANAGEMENT
Environmental Statement
VOL 1 CH 7 SOCIO ECONOMICS
Environmental Statement
VOL 1 CH 8 TRANSPORT AND ACCESS
Environmental Statement
VOL 1 CH 9 AIR QUALITY
Environmental Statement
VOL 1 CONTENTS AND GLOSSARY
Environmental Statement
VOL 2 FIGURES - SELECTION OF PLANNING DRAWINGS
Environmental Statement
VOL 2 FIGURES 1.1 - 4.1
Environmental Statement
VOL 2 FIGURES 14.2 - 17.1
Environmental Statement
VOL 2 FIGURES 4.2 - 7.2
Environmental Statement
VOL 2 FIGURES 7.3 - 14.1
Environmental Statement
VOL 3 APPENDIX 1.1 LOCATION OF INFORMATION WITHIN THE ES
Environmental Statement
VOL 3 APPENDIX 1.2 COMPETENT EXPERTS
Environmental Statement
VOL 3 APPENDIX 10.1 GLOSSARY OF ACOUSTIC TERMINOLOGY
Environmental Statement
VOL 3 APPENDIX 10.2 LBTH NOISE LEGISLATION POLICY AND GUIDANCE
Environmental Statement
VOL 3 APPENDIX 10.3 ENVIRONMENTAL BASELINE NOISE AND VIBRATION LEVELS
Environmental Statement
VOL 3 APPENDIX 10.4 CONSULTATION ON NOISE BASELINE SURVEY
Environmental Statement
VOL 3 APPENDIX 10.5 CONSTRUCTION NOISE ASSESSMENT
Environmental Statement
VOL 3 APPENDIX 10.6 ROAD TRAFFIC NOISE ASSESSMENT
Environmental Statement
VOL 3 APPENDIX 11.1 ARCHAEOLOGICAL DESK BASED ASSESSMENT
Environmental Statement
VOL 3 APPENDIX 12.1 PRELIMINARY RISK ASSESSMENT_PART 1
Environmental Statement
VOL 3 APPENDIX 12.1 PRELIMINARY RISK ASSESSMENT_PART 2
Environmental Statement
VOL 3 APPENDIX 12.1 PRELIMINARY RISK ASSESSMENT_PART 3
Environmental Statement
VOL 3 APPENDIX 12.1 PRELIMINARY RISK ASSESSMENT_PART 4
Environmental Statement
VOL 3 APPENDIX 12.1 PRELIMINARY RISK ASSESSMENT_PART 5
Environmental Statement
VOL 3 APPENDIX 13.1 FLOOD RISK ASSESSMENT
Environmental Statement
VOL 3 APPENDIX 13.2 SUSTAINABLE DRAINAGE STRATEGY
Environmental Statement
VOL 3 APPENDIX 13.3 FOUL SEWERAGE AND UTILITIES ASSESSMENT
Environmental Statement
VOL 3 APPENDIX 14.1 DSO DRAWINGS
Environmental Statement
VOL 3 APPENDIX 14.2 TO 14.6 DSO
Environmental Statement
VOL 3 APPENDIX 15.1 WIND MICROCLIMATE TECHNICAL REPORT
Environmental Statement
VOL 3 APPENDIX 16.1 TO 16.2 GREENHOUSE GASES
Environmental Statement
VOL 3 APPENDIX 2.1 CUMULATIVE SCHEMES ASSESSED
Environmental Statement
VOL 3 APPENDIX 6.1 OUTLINE CEMP
Environmental Statement
VOL 3 APPENDIX 7.1 SOCIO ECONOMICS PLANNING POLICY AND GUIDANCE
Environmental Statement
VOL 3 APPENDIX 8.1 TRANSPORT ASSESSMENT_PART 1
Environmental Statement
VOL 3 APPENDIX 8.1 TRANSPORT ASSESSMENT_PART 2
Environmental Statement
VOL 3 APPENDIX 9.1 AIR QUALITY LEGISLATION AND POLICY
Environmental Statement
VOL 3 APPENDIX 9.2 AIR QUALITY BASELINE
Environmental Statement
VOL 3 APPENDIX 9.3 CONSTRUCTION DUST RISK ASSESSMENT
Environmental Statement
VOL 3 APPENDIX 9.4 AIR QUALITY MODELLING STUDY
Environmental Statement
VOL 3 APPENDIX 9.5 SITE SUITABILITY ASSESSMENT
Environmental Statement
VOL 3 APPENDIX 9.6 AIR QUALITY NEUTRAL ASSESSMENT
Environmental Statement
VOL 3 APPENDIX 9.7 AIR QUALITY POSITIVE
Environmental Statement
VOL 3 CONTENTS
Environmental Statement
VOL 4 BUILT HERITAGE TOWNSCAPE VISUAL IMPACT ASSESSMENT_PART 1
Environmental Statement
VOL 4 BUILT HERITAGE TOWNSCAPE VISUAL IMPACT ASSESSMENT_PART 2
Environmental Statement
VOL 4 BUILT HERITAGE TOWNSCAPE VISUAL IMPACT ASSESSMENT_PART 3
Environmental Statement
VOL 4 BUILT HERITAGE TOWNSCAPE VISUAL IMPACT ASSESSMENT_PART 4
Environmental Statement
WASTE MANAGEMENT PLAN
Report
WCA APARTMENT LAYOUTS
Current Plan
WCA APARTMENT LAYOUTS
Current Plan
WCA APARTMENT LAYOUTS
Current Plan
WCA PBSA ROOM LAYOUTS
Current Plan
WCA PBSA ROOM LAYOUTS
Current Plan
WHOLE LIFE CARBON ASSESSMENT
Report
WHOLE LIFE CARBON ASSESSMENT GLA TEMPLATE
Correspondence