← Tower Hamlets

Status

Registered Demolition
Received
29 Nov 2024
New homes
0

Full proposal

Demolition of the existing leisure centre building and other associated structures as part of a phased redevelopment of the site to include erection of a replacement leisure centre building with ancillary café use and external cycle parking; erection of a 9 storey residential building to provide 30 affordable homes; public realm improvements to St George's Gardens including landscaping and new and replacement play provision; shared accessible car parking and a servicing yard with access from The Highway and associated works; restoration of former mortuary building for flexible Use Class E; re-location of 52 headstones which have been previously re-located during the construction works for the existing St George's Leisure Centre, to be positioned against listed wall adjacent to Angel Mews.

Documents

02.10.2025
Drawing/Document Issue Register
Not yet archived · Original link
ACCESSIBLE HOUSING STATEMENT
Report
Not yet archived · Original link
ACTIVE TRAVEL ZONE (ATZ) ASSESSMENT
Report
Not yet archived · Original link
ADDENDUM - REV P04 - PART 1
Design & Access Statement
Not yet archived · Original link
ADDENDUM - REV P04 - PART 2
Design & Access Statement
Not yet archived · Original link
ADDENDUM - REV P04 - PART 3
Design & Access Statement
Not yet archived · Original link
ADDENDUM - REV P04 - PART 4
Design & Access Statement
Not yet archived · Original link
AFFORDABLE HOUSINGSTATEMENT
Report
Not yet archived · Original link
AIR QUALITY ASSESSMENT
Report
Not yet archived · Original link
APPENDICES
Daylight & Sunlight
Not yet archived · Original link
APPENDIX C DRAINAGE STRATEGY
Flood Risk Assessment
Not yet archived · Original link
Application Form
Application Form
Not yet archived · Original link
ARBORICULTURAL METHOD STATEMENT
Report
Not yet archived · Original link
ARCHAEOLOGICAL DESK-BASED ASSESSMENT
Report
Not yet archived · Original link
ARCHAEOLOGICAL EVALUATION REPORT
Report
Not yet archived · Original link
BASEMENT IMPACT ASSESSMENT & STRUCTURAL METHODOLOGY STATEMENT
Report
Not yet archived · Original link
BASEMENT IMPACT ASSESSMENT - APPENDIX A - PART 1
Report
Not yet archived · Original link
BASEMENT IMPACT ASSESSMENT - APPENDIX A - PART 2
Report
Not yet archived · Original link
BASEMENT IMPACT ASSESSMENT - APPENDIX A - PART 3
Report
Not yet archived · Original link
BASEMENT IMPACT ASSESSMENT - APPENDIX A - PART 4
Report
Not yet archived · Original link
BASEMENT IMPACT ASSESSMENT - APPENDIX A - PART 5
Report
Not yet archived · Original link
BASEMENT IMPACT ASSESSMENT - APPENDIX A - PART 6
Report
Not yet archived · Original link
BAT SURVEY REPORT
Report
Not yet archived · Original link
BAY STUDY - SHARED SERVICES / PARKING
Current Plan
Not yet archived · Original link
BAY STUDY - SOLANDER GARDENS
Current Plan
Not yet archived · Original link
BAY STUDY - ST GEORGES GARDENS
Current Plan
Not yet archived · Original link
BAY STUDY - THE HIGHWAY
Current Plan
Not yet archived · Original link
BIODIVERSITY NET GAIN ASSESSMENT
Report
Not yet archived · Original link
BNG LETTER - 03.10.2025
Correspondence
Not yet archived · Original link
BY GATEWAY ONE
Planning Statement
Not yet archived · Original link
BY MONTAGU EVANS
Planning Statement
Not yet archived · Original link
BY MONTAGU EVANS - ADDENDUM
Planning Statement
Not yet archived · Original link
CCTV SURVEY DRAWING
Current Plan
Not yet archived · Original link
CIRCULAR ECONOMY STATEMENT
Report
Not yet archived · Original link
CONSTRUCTION AND DEMOLITION ENVIRONMENTAL MANAGEMENT PLAN
Report
Not yet archived · Original link
COVER LETTER - 12 AUGUST 2025
Correspondence
Not yet archived · Original link
COVERING LETTER DATED: 18 OCTOBER 2024
Correspondence
Not yet archived · Original link
CURTILAGE LISTED WALL FOR DEMOLITION - EXISTING PLAN
Current Plan
Not yet archived · Original link
Daylight & Sunlight
Daylight & Sunlight
Not yet archived · Original link
DESK STUDY & GROUND INVESTIGATION - PART 1
Report
Not yet archived · Original link
DESK STUDY & GROUND INVESTIGATION - PART 2
Report
Not yet archived · Original link
DESK STUDY & GROUND INVESTIGATION - PART 3
Report
Not yet archived · Original link
DESK STUDY & GROUND INVESTIGATION - PART 4
Report
Not yet archived · Original link
DESK STUDY & GROUND INVESTIGATION - PART 5
Report
Not yet archived · Original link
DRAINAGE STRATEGY & FLOOD RISK ASSESSMENT
Report
Not yet archived · Original link
DRAINAGE STRATEGY & FLOOD RISK ASSESSMENT - APPENDIX B - TOPOGRAPHICAL SURVEY
Report
Not yet archived · Original link
DRAINAGE STRATEGY & FLOOD RISK ASSESSMENT - APPENDIX C - GROUND INVESTIGATION BOREHOLE LOGS
Report
Not yet archived · Original link
DRAINAGE STRATEGY & FLOOD RISK ASSESSMENT - APPENDIX D - FLOOD-MAP-PLANNING
Report
Not yet archived · Original link
DRAINAGE STRATEGY & FLOOD RISK ASSESSMENT - APPENDIX E - TW ASSET PLAN
Report
Not yet archived · Original link
DRAINAGE STRATEGY & FLOOD RISK ASSESSMENT - APPENDIX F - CCTV SURVEY DRAWING
Report
Not yet archived · Original link
DRAINAGE STRATEGY & FLOOD RISK ASSESSMENT - APPENDIX G - GREENFIELD RUNOFF RATE ESTIMATION
Report
Not yet archived · Original link
DRAINAGE STRATEGY & FLOOD RISK ASSESSMENT - APPENDIX H - DRAINAGE DRAWINGS
Report
Not yet archived · Original link
DRAINAGE STRATEGY & FLOOD RISK ASSESSMENT - APPENDIX I - INFODRAINAGE MODEL RESULTS SUMMARY
Report
Not yet archived · Original link
DRAINAGE STRATEGY & FLOOD RISK ASSESSMENT - APPENDIX J
Report
Not yet archived · Original link
ELEVATIONS SHEET 1 OF 2
Current Plan
Not yet archived · Original link
ENERGY STRATEGY
Report
Not yet archived · Original link
ENERGY STRATEGY - APPENDIX
Report
Not yet archived · Original link
EXISTING BASEMENT FLOOR PLAN
Current Plan
Not yet archived · Original link
EXISTING FIRST FLOOR PLAN
Current Plan
Not yet archived · Original link
EXISTING GROUND FLOOR PLAN
Current Plan
Not yet archived · Original link
EXISTING LOCATION PLAN
Current Plan
Not yet archived · Original link
EXISTING PLAN AND ELEVATION - LISTED NORTHERN BOUNDARY WALL
Current Plan
Not yet archived · Original link
Current Plan
Archived · Original link
FEASIBILITY NOTE
Correspondence
Not yet archived · Original link
FIGURE 1 - SLP
Committee Report
Not yet archived · Original link
FIGURE 10 & 14 - ILLUSTRATIVE MASTERPLAN
Committee Report
Not yet archived · Original link
FIGURE 19 - TREE PLAN
Committee Report
Not yet archived · Original link
FIGURE 29 - PAOS
Committee Report
Not yet archived · Original link
FIRE SAFETY STATEMENT
Report
Not yet archived · Original link
FLOOD MAP FOR PLANNING
Current Plan
Not yet archived · Original link
FORMER MORTUARY BUILDING - EXISTING PLANS AND ELEVATIONS
Current Plan
Not yet archived · Original link
FRAMEWORK CONSTRUCTION TRANSPORT MANAGEMENT PLAN
Report
Not yet archived · Original link
FRAMEWORK DELIVERY, LOGISTICS, SERVICING AND PARKING MANAGEMENT PLAN
Report
Not yet archived · Original link
FRAMEWORK DELIVERY, LOGISTICS, SERVICING AND PARKING MANAGEMENT PLAN
Report
Not yet archived · Original link
GIA SCHEDULE
Current Plan
Not yet archived · Original link
GREENFIELD RUNOFF RATE ESTIMATION
Correspondence
Not yet archived · Original link
GROUND FLOOR FURNITURE AND LANDSCAPE ELEMENTS PLAN
Current Plan
Not yet archived · Original link
GROUND FLOOR GENERAL ARRANGEMENT PLAN
Current Plan
Not yet archived · Original link
GROUND FLOOR HARD LANDSCAPE PLAN
Current Plan
Not yet archived · Original link
GROUND FLOOR ILLUSTRATIVE MASTERPLAN
Current Plan
Not yet archived · Original link
GROUND FLOOR SOFT LANDSCAPE PLAN
Current Plan
Not yet archived · Original link
GROUND FLOOR TREE STRATEGY PLAN
Current Plan
Not yet archived · Original link
GROUND INVESTIGATION BOREHOLE LOGS
Correspondence
Not yet archived · Original link
HEADSTONES EXISTING LOCATION - EXISTING PLAN AND ELEVATION
Current Plan
Not yet archived · Original link
HEADSTONES PROPOSED LOCATION - PROPOSED PLAN AND ELEVATION
Current Plan
Not yet archived · Original link
HEALTH AND SAFETY EXECUTIVE
Consultee Comment
Not yet archived · Original link
HEALTH IMPACT ASSESSMENT
Report
Not yet archived · Original link
HERITAGE IMPACT ASSESSMENT
Report
Not yet archived · Original link
HERITAGE IMPACT ASSESSMENT ADDENDUM
Report
Not yet archived · Original link
HISTORIC ENGLAND
Consultee Comment
Not yet archived · Original link
HISTORIC ENGLAND - 10 APRIL 2025
Consultee Comment
Not yet archived · Original link
HISTORIC ENGLAND - 18 AUGUST 2025
Consultee Comment
Not yet archived · Original link
HISTORIC ENGLAND - 20.12.2024
Consultee Comment
Not yet archived · Original link
HISTORIC ENGLAND - 23.12.2024
Consultee Comment
Not yet archived · Original link
INFODRAINAGE MODEL RESULTS SUMMARY
Correspondence
Not yet archived · Original link
LANDSCAPING PLANS
Drawing/Document Issue Register
Not yet archived · Original link
LEISURE CENTRE - DETAILED SECTION - FAÇADE STUDY 01
Current Plan
Not yet archived · Original link
LEISURE CENTRE - DETAILED SECTION - FAÇADE STUDY 02
Current Plan
Not yet archived · Original link
LEISURE CENTRE - DETAILED SECTION - FAÇADE STUDY 03
Current Plan
Not yet archived · Original link
LEISURE CENTRE - DETAILED SECTION - FAÇADE STUDY 04
Current Plan
Not yet archived · Original link
LIGHTING IMPACT ASSESSMENT
Report
Not yet archived · Original link
LONDON PLAN FIRE SAFETY STATEMENT
Report
Not yet archived · Original link
MATERIALITY OPTION STUDY
Report
Not yet archived · Original link
NATURAL ENGLAND
Consultee Comment
Not yet archived · Original link
NATURAL ENGLAND - ANNEX A ? NATURAL ENGLAND GENERAL ADVICE
Consultee Comment
Not yet archived · Original link
NEIGHBOURING PROPERTIES
Daylight & Sunlight
Not yet archived · Original link
NOISE IMPACT ASSESSMENT
Report
Not yet archived · Original link
PART 1
Design & Access Statement
Not yet archived · Original link
PART 10
Design & Access Statement
Not yet archived · Original link
PART 11
Design & Access Statement
Not yet archived · Original link
PART 12
Design & Access Statement
Not yet archived · Original link
PART 2
Design & Access Statement
Not yet archived · Original link
PART 3
Design & Access Statement
Not yet archived · Original link
PART 4
Design & Access Statement
Not yet archived · Original link
PART 5
Design & Access Statement
Not yet archived · Original link
PART 6
Design & Access Statement
Not yet archived · Original link
PART 7
Design & Access Statement
Not yet archived · Original link
PART 8
Design & Access Statement
Not yet archived · Original link
PART 9
Design & Access Statement
Not yet archived · Original link
PEDESTRIAN LEVEL WIND MICROCLIMATE ASSESSMENT
Report
Not yet archived · Original link
PHASING PLAN
Current Plan
Not yet archived · Original link
PLANNING REPORT - FLUES AND VENTILATION EXTRACTION DETAILS
Report
Not yet archived · Original link
PLAY SPACE CONDITION SURVEY
Report
Not yet archived · Original link
POTENTIAL LAYBY DESIGN
Current Plan
Not yet archived · Original link
PRE- PLANNING ENQUIRY APPLICATION FORM
Correspondence
Not yet archived · Original link
PRELIMINARY ECOLOGICAL APPRAISAL
Report
Not yet archived · Original link
PRELIMINARY RISK ASSESSMENT - PART 1
Report
Not yet archived · Original link
PRELIMINARY RISK ASSESSMENT - PART 2
Report
Not yet archived · Original link
PRELIMINARY RISK ASSESSMENT - PART 3
Report
Not yet archived · Original link
PRELIMINARY RISK ASSESSMENT - PART 4
Report
Not yet archived · Original link
PRELIMINARY RISK ASSESSMENT - PART 5
Report
Not yet archived · Original link
PRELIMINARY RISK ASSESSMENT - PART 6
Report
Not yet archived · Original link
PRELIMINARY RISK ASSESSMENT - PART 7
Report
Not yet archived · Original link
PRELIMINARY RISK ASSESSMENT - PART 8
Report
Not yet archived · Original link
PRELIMINARY RISK ASSESSMENT - PART 9
Report
Not yet archived · Original link
PROPOSED BELOW GROUND DRAINAGE DETAILS
Current Plan
Not yet archived · Original link
PROPOSED DEVELOPMENT
Daylight & Sunlight
Not yet archived · Original link
PROPOSED DRAINAGE LAYOUT - BASEMENT
Current Plan
Not yet archived · Original link
PROPOSED DRAINAGE LAYOUT - GROUND FLOOR
Current Plan
Not yet archived · Original link
PROPOSED EAST ELEVATION - SOLANDER GARDENS
Current Plan
Not yet archived · Original link
PROPOSED FLOOR PLAN - BASEMENT (LEISURE)
Current Plan
Not yet archived · Original link
PROPOSED FLOOR PLAN - FIRST FLOOR (LEISURE) - SECOND FLOOR (RESIDENTIAL)
Current Plan
Not yet archived · Original link
PROPOSED FLOOR PLAN - FIRST FLOOR (RESIDENTIAL)
Current Plan
Not yet archived · Original link
PROPOSED FLOOR PLAN - FOURTH FLOOR (RESIDENTIAL)
Current Plan
Not yet archived · Original link
PROPOSED FLOOR PLAN - GROUND FLOOR
Current Plan
Not yet archived · Original link
PROPOSED FLOOR PLAN - PLANT MEZZANINE (LEISURE) - SEVENTH FLOOR (RESIDENTIAL)
Current Plan
Not yet archived · Original link
PROPOSED FLOOR PLAN - ROOF (LEISURE) - EIGHTH FLOOR (RESIDENTIAL)
Current Plan
Not yet archived · Original link
PROPOSED FLOOR PLAN - ROOF (LEISURE) - FIFTH FLOOR (RESIDENTIAL)
Current Plan
Not yet archived · Original link
PROPOSED FLOOR PLAN - SECOND FLOOR (LEISURE) - THIRD FLOOR (RESIDENTIAL)
Current Plan
Not yet archived · Original link
PROPOSED FLOOR PLAN - SIXTH FLOOR (RESIDENTIAL)
Current Plan
Not yet archived · Original link
PROPOSED GA ELEVATIONS
Current Plan
Not yet archived · Original link
PROPOSED GA PLAN - EIGHTH FLOOR
Current Plan
Not yet archived · Original link
PROPOSED GA PLAN - FIFTH FLOOR
Current Plan
Not yet archived · Original link
PROPOSED GA PLAN - FIRST FLOOR
Current Plan
Not yet archived · Original link
PROPOSED GA PLAN - FOURTH FLOOR
Current Plan
Not yet archived · Original link
PROPOSED GA PLAN - GROUND FLOOR
Current Plan
Not yet archived · Original link
PROPOSED GA PLAN - ROOF
Current Plan
Not yet archived · Original link
PROPOSED GA PLAN - SECOND FLOOR
Current Plan
Not yet archived · Original link
PROPOSED GA PLAN - SEVENTH FLOOR
Current Plan
Not yet archived · Original link
PROPOSED GA PLAN - SIXTH FLOOR
Current Plan
Not yet archived · Original link
PROPOSED GA PLAN - THIRD FLOOR
Current Plan
Not yet archived · Original link
PROPOSED GA SECTIONS
Current Plan
Not yet archived · Original link
PROPOSED LAYBY
Current Plan
Not yet archived · Original link
PROPOSED LOCATION PLAN
Current Plan
Not yet archived · Original link
PROPOSED NORTH ELEVATION - ST GEORGES GARDENS
Current Plan
Not yet archived · Original link
PROPOSED ROOF PLAN
Current Plan
Not yet archived · Original link
PROPOSED SECTION AA
Current Plan
Not yet archived · Original link
PROPOSED SECTION BB
Current Plan
Not yet archived · Original link
PROPOSED SECTION CC
Current Plan
Not yet archived · Original link
Current Plan
Archived · Original link
PROPOSED SITE SURFACE WATER DRAINAGE STRATEGY
Current Plan
Not yet archived · Original link
PROPOSED SOUTH ELEVATION - THE HIGHWAY
Current Plan
Not yet archived · Original link
PROPOSED WEST ELEVATION - SHARED SERVICES/PARKING
Current Plan
Not yet archived · Original link
RESUBMISSION COVER LETTER - 06.10.2025
Correspondence
Not yet archived · Original link
ROAD SAFETY AUDITOR?S ADDENDUM
Correspondence
Not yet archived · Original link
ROOF LEVELS GENERAL ARRANGEMENT PLAN
Current Plan
Not yet archived · Original link
ROOF LEVELS ILLUSTRATIVE MASTERPLAN
Current Plan
Not yet archived · Original link
RRW PLAN
Correspondence
Not yet archived · Original link
SCHEDULE OF REQUIRED INFORMATION
Correspondence
Not yet archived · Original link
SITE DEMOLITION PLAN
Current Plan
Not yet archived · Original link
SITE DEMOLITION PLAN - LISTED BUILDING CONSENT
Current Plan
Not yet archived · Original link
STATEMENT OF COMMUNITY INVOLVEMENT
Report
Not yet archived · Original link
STATUTORY BIODIVERSITY METRIC - FV01
Correspondence
Not yet archived · Original link
STATUTORY BIODIVERSITY METRIC - FV02
Correspondence
Not yet archived · Original link
SUSTAINABILITY STATEMENT
Report
Not yet archived · Original link
TECHNICAL NOTE: DELIVERIES AND DISABLED PARKING
Report
Not yet archived · Original link
TFL
Consultee Comment
Not yet archived · Original link
TFL
Consultee Comment
Not yet archived · Original link
THAMES WATER
Consultee Comment
Not yet archived · Original link
TOPOGRAPHICAL SURVEY PLANS
Current Plan
Not yet archived · Original link
TOWNSCAPE AND VISUAL IMPACT APPRAISAL
Report
Not yet archived · Original link
TOWNSCAPE AND VISUAL IMPACT APPRAISAL ADDENDUM - PART 1
Report
Not yet archived · Original link
TOWNSCAPE AND VISUAL IMPACT APPRAISAL ADDENDUM - PART 2
Report
Not yet archived · Original link
TRANSPORT ASSESSMENT
Report
Not yet archived · Original link
Transport Statement
Transport Statement
Not yet archived · Original link
TRAVEL PLAN
Report
Not yet archived · Original link
TW ASSET PLAN
Correspondence
Not yet archived · Original link
URBAN GREENING FACTOR REPORT
Report
Not yet archived · Original link
WHOLE LIFE CARBON ASSESSMENT
Report
Not yet archived · Original link
WRITTEN SCHEME OF INVESTIGATION FOR A PRE- DETERMINATION ARCHAEOLOGICAL EVALUATION
Correspondence
Not yet archived · Original link

Have your say

Your comment matters. Councils must consider every representation that raises material planning considerations.

Write a comment