← Back to Southwark
Status
Awaiting decision
Received
23 Dec 2024
New dwellings
n/a
What you can do
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.
Full Proposal
Material amendment under section 73 of the Town and Country Planning Act 1990 to reference number 07/AP/1262, as amended by 13/AP/4266, to secure amendments Blocks A, B, C, and D and associated landscape only including ammendments to the internal configuration, external design and overall massing, mix and unit numbers, and variation of the conditions of consent including to allow for: Changes to façade design and composition of all buildings to meet updated fire regulations and energy and sustainability standards as well as addressing overheating; Adjustments to building footprint, form, and massing; Internal reconfiguration of units to address the current Nationally Described Space Standards, resulting in a change in mix and a reduction in units from 589 to 566; Re-organisation of building cores, additional staircases and inclusion of additional fire safety features including sprinklers; Change from winter gardens to a mix of winter gardens and balconies; Addition of plant, lift overruns, smoke vents and risers on the roof of buildings, contributing to overall increases in building massing and heights ranging between 3.9 and 4.9 metres; Addition of new residential amenity facilities in Building A, C and D, including swimming pool a gym uses; Amendments to condition 34 to reflect the reduction in commercial floorspace by 113m2; Inclusion of revised energy strategy, facilitated by inclusion of rooftop plant; Amendment to basement layout to accommodate Thames Tideway Tunnel infrastructure; Rise in finished floor level of building C for flood protection.
Documents
2007 SURVEYED BASELINE DSO RESULTS FOR ISSUE.XLSX
Daylight/Sunlight assessment
2007 SURVEYED BASELINE VS CONSENTED - IMAGES
Daylight/Sunlight assessment
2007 SURVEYED BASELINE VS PROPOSED - IMAGES .PDF
Daylight/Sunlight assessment
24.AP.1547_PUBLIC COMMENTS
Comment - Contributor
6421-250523-EKJB (2007 BASELINE LETTER).PDF
Daylight/Sunlight assessment
6421-250610-EK (2007 BASELINE ADDENDUM LETTER)
Daylight/Sunlight assessment
7152-AL-SITE-00-102-REV-REV P10
Plan - Proposed
AFFORDABLE ELEVATIONS: NORTH
Plan - Existing
AFFORDABLE ELEVATIONS: SOUTH
Plan - Existing
APPLICATION FORM - WITHOUT PERSONAL DATA
Application - Form (Without Personal data)
ASSESSMENT 1 & 2 - EX, CONS AND PROPO RESULTS.XLSX
Daylight/Sunlight assessment
ASSESSMENT 1 - IMAGES.PDF
Daylight/Sunlight assessment
ASSESSMENT 1 - RESULTS - 2007 BASELINE WITH PHASE 1 VS PROPOSED.PDF
Daylight/Sunlight assessment
ASSESSMENT 1 - RESULTS.XLSX
Daylight/Sunlight assessment
ASSESSMENT 2 - IMAGES.PDF
Daylight/Sunlight assessment
ASSESSMENT 2 - RESULTS - 2007 BASELINE WITH PHASE 1 VS CONSENTED WITHOUT PHASE 1
Daylight/Sunlight assessment
ASSESSMENT 2 - RESULTS.XLSX
Daylight/Sunlight assessment
ASSESSMENT 3 & 4 COMBINED - EX V CONSENT AND PROP RESULTS.XLSX
Daylight/Sunlight assessment
ASSESSMENT 3 - IMAGES.PDF
Daylight/Sunlight assessment
ASSESSMENT 3 - RESULTS - 2007 BASELINE WITHOUT PHASE 1 VS PROPOSED DEVELOPMENT W
Daylight/Sunlight assessment
ASSESSMENT 3 - RESULTS.XLSX
Daylight/Sunlight assessment
ASSESSMENT 4 - IMAGES.PDF
Daylight/Sunlight assessment
ASSESSMENT 4 - RESULTS - 2007 BASELINE WITHOUT PHASE 1 VS CONSENTED WITH PHASE 1
Daylight/Sunlight assessment
ASSESSMENT 4 - RESULTS.XLSX
Daylight/Sunlight assessment
BUILDING F DETAIL ELEVATION
Plan - Existing
CHAMBERS WHARF LBS LETTER 18.03.25.PDF
!Key Document
CHAMBERS WHARF TOWNSCAPE VIEWS APR 25 (1).PDF
Document
COMMUNITY INFRASTRUCTURE LEVY - COMPLETED FORM
CIL - GIA Form
COVERING LETTER
Application - Covering letter
CW PHASE 2 - ACCOMODATION SCHEDULE REV 11 DATED 21.05.2024
Plan - Proposed
CW TOWNSCAPE NOTE APRIL 2025-002.PDF
Document
DESIGN AND ACCESS STATEMENT
Design and Access statement
DESIGN AND ACCESS STATEMENT
Design and Access statement
DESIGN AND ACCESS STATEMENT
Design and Access statement
DESIGN AND ACCESS STATEMENT
Design and Access statement
DESIGN AND ACCESS STATEMENT
Design and Access statement
DRAWING 051 WITH OVERLAY OF THE CONSENTED BUILDING A OUTLINE AND ADJACENT LUNA H
Plan - Proposed
ECOLOGICAL ASSESSMENT
Document
EIA NOTE - CW_EIA_NOTE_FINAL 04 MARCH 2025_COMPRESSED
Document
ELEVATIONS: EAST
Plan - Existing
ELEVATIONS: NORTH
Plan - Existing
ELEVATIONS: PUBLIC ROUTEELEVATION
Plan - Existing
ELEVATIONS: RIVER WALK ELEVATION
Plan - Existing
ELEVATIONS: WEST
Plan - Existing
ENERGY AND OVERHEATING REPORT
Energy statement
ENVIRONMENT AGENCY
Statutory consultee replies
ENVIRONMENTAL STATEMENT
Environmental statement
EQIA CHAMBERS WHARF.PDF
Document
GA ACCESSIBLE BASEMENT PLAN
Plan - Existing
GA BLOCK A COURTYARD DETAIL ELEVATION
Plan - Existing
GA BLOCK C STREET DETAIL ELEVATION
Plan - Existing
GA EIGHT FLOOR PLAN
Plan - Existing
GA ELEVENTH FLOOR PLAN
Plan - Existing
GA FIRST FLOOR PLAN
Plan - Existing
GA FOURTH AND FIFTH FLOOR PLAN
Plan - Existing
GA GROUND FLOOR PLAN
Plan - Existing
GA NINTH FLOOR PLAN
Plan - Existing
GA ROOF PLAN
Plan - Existing
GA SECOND AND THIRD FLOOR PLAN
Plan - Existing
GA SEVENTH FLOOR PLAN
Plan - Existing
GA SIXTH FLOOR PLAN
Plan - Existing
GA TENTH FLOOR PLAN
Plan - Existing
GA THIRTEENTH FLOOR PLAN
Plan - Existing
GA TWELFTH FLOOR PLAN
Plan - Existing
GATEWAY 1 FIRE STATEMENT
Fire Statement
ITEM 7.3
Committee - Report
ITEM 9.3
Committee - Report
LETTER OF OBJECTION
Comment - Contributor
LETTER OF OBJECTION
Comment - Contributor
LETTER OF OBJECTION
Comment - Contributor
LETTER OF OBJECTION
Comment - Contributor
LETTER OF OBJECTION
Comment - Contributor
LETTER OF OBJECTION
Comment - Contributor
LOCATION PLAN
Plan - Existing
LONDON CITY AIRPORT
Statutory consultee replies
LONDON CITY AIRPORT
Statutory consultee replies
LONDON PLAN FIRE STATEMENT ? ISSUE 06
Fire Statement
MINIMUM WIDTHS OF THE THAMES PATH ACROSS THE SITE
Plan - Proposed
OBJECTION
Comment - Contributor
OBJECTION
Comment - Contributor
OBJECTION
Comment - Contributor
OBJECTION FOR 22ND MEET
Comment - Contributor
PLANNING STAGE CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN
Construction Environmental Management Plan CEMP
PLANS EXPLAINING HEIGHT INCREASE
Document
PLANS EXPLAINING HEIGHT INCREASE
Document
PLANS EXPLAINING HEIGHT INCREASE
Document
PLANS EXPLAINING HEIGHT INCREASE
Document
PRESS NOTICE - 20/03/2025
Press Notice
PRESS NOTICE - 23/01/2025
Press Notice
PRIVATE ELEVATIONS: SOUTH
Plan - Existing
PROPOSED CONTEXT ELEVATIONS
Plan - Existing
PROPOSED CONTEXT ELEVATIONS
Plan - Existing
PROPOSED CONTEXT ELEVATIONS
Plan - Existing
PROPOSED CONTEXT ELEVATIONS: N & S
Plan - Existing
PROPOSED CONTEXT SECTIONS AA & BB
Plan - Existing
PROPOSED CONTEXT SECTIONS CC & DD
Plan - Existing
PUBLIC COMMENT RECEIVED ON APPLICATION
Comment - Contributor
PUBLIC COMMENT RECEIVED ON APPLICATION
Comment - Contributor
PUBLIC COMMENT RECEIVED ON APPLICATION
Comment - Contributor
RE: CHAMBERS WHARF ? CONSENTED AND PROPOSED DAYLIGHT AND SUNLIGHT RESULTS
Document
RE: CHAMBERS WHARF ? DAYLIGHT AND SUNLIGHT RESPONSE TO RIGHTS OF LIGHT CONSULTIN
Other
REVISED DAS - COMPLETE
Design and Access statement
REVISED DAS - SECTION 10
Design and Access statement
REVISED DAS - SECTION 11
Design and Access statement
REVISED DAS - SECTION 12
Design and Access statement
REVISED DAS - SECTION 13
Design and Access statement
REVISED DAS - SECTION 6
Design and Access statement
REVISED DAS - SECTION 7
Design and Access statement
REVISED DAS - SECTION 8
Design and Access statement
REVISED DAS - SECTION 9
Design and Access statement
REVISED DRAWING SCHEDULE - PAGE 67 FROM 10429_SHP_RP_PL05_COMPLETE.PDF
Document
RIGHT OF LIGHT CONSULTING LETTER PREPARED ON BEHALF OF NEIGHBOURS
Comment - Contributor
RIGHT OF LIGHT CONSULTING LETTER PREPARED ON BEHALF OF NEIGHBOURS
Comment - Contributor
SITE NOTICE
!Key Document
SKETCH CROSS SECTION THROUGH BUILDING A LOOKING NORTH AT ITS FULL HEIGHT AND ADJ
Plan - Proposed
SUBMITTED 10.03.2025 - AFFORDABLE ELEVATIONS: SOUTH
Plan - Proposed
SUBMITTED 10.03.2025 - CONTEXT SECTIONS AA&BB
Plan - Proposed
SUBMITTED 10.03.2025 - CONTEXT SECTIONS CC& DD
Plan - Proposed
SUBMITTED 10.03.2025 - ELEVATION : RIVER WALK
Plan - Proposed
SUBMITTED 10.03.2025 - ELEVATION: PUBLIC ROUTE ELEVATION
Plan - Proposed
SUBMITTED 10.03.2025 - ELEVATIONS: EAST
Plan - Proposed
SUBMITTED 10.03.2025 - ELEVATIONS: NORTH
Plan - Proposed
SUBMITTED 10.03.2025 - ELEVATIONS: WEST
Plan - Proposed
SUBMITTED 10.03.2025 - GA ACCESSIBLE BASEMENT FLOOR PLAN
Plan - Proposed
SUBMITTED 10.03.2025 - GA BLOCK A COURTYARD DETAIL ELEVATIONS
Plan - Proposed
SUBMITTED 10.03.2025 - GA EIGHT FLOOR PLAN
Plan - Proposed
SUBMITTED 10.03.2025 - GA ELEVENTH FLOOR PLAN
Plan - Proposed
SUBMITTED 10.03.2025 - GA FIRST FLOOR PLAN
Plan - Proposed
SUBMITTED 10.03.2025 - GA FOURTH AND FIFTH FLOOR PLAN
Plan - Proposed
SUBMITTED 10.03.2025 - GA GROUND FLOOR PLAN
Plan - Proposed
SUBMITTED 10.03.2025 - GA NINTH FLOOR PLAN
Plan - Proposed
SUBMITTED 10.03.2025 - GA ROOF PLAN
Plan - Proposed
SUBMITTED 10.03.2025 - GA SECOND AND THIRD FLOOD PLAN
Plan - Proposed
SUBMITTED 10.03.2025 - GA SEVENTH FLOOR PLAN
Plan - Proposed
SUBMITTED 10.03.2025 - GA SIXTH FLOOR PLAN
Plan - Proposed
SUBMITTED 10.03.2025 - GA TENTH FLOOR PLAN
Plan - Proposed
SUBMITTED 10.03.2025 - GA THIRTEENTH FLOOR PLAN
Plan - Proposed
SUBMITTED 10.03.2025 - GA TWELFTH FLOOR PLAN
Plan - Proposed
SUBMITTED 10.03.2025 - ILLUSTRATIVE LANDSCAPE PROPOSALS
Plan - Proposed
SUBMITTED 10.03.2025 - PRIVATE ELEVATIONS: SOUTH
Plan - Proposed
SUBMITTED 10.03.2025 - PROPOSED CONTEXT ELEVATIONS
Plan - Proposed
SUBMITTED 10.03.2025 - PROPOSED CONTEXT ELEVATIONS
Plan - Proposed
SUBMITTED 10.03.2025 - PROPOSED CONTEXT ELEVATIONS
Plan - Proposed
SUBMITTED 10.03.2025 - PROPOSED CONTEXT ELEVATIONS - N&S
Plan - Proposed
SUBMITTED 10.03.2025 - PROPOSED LOCATION PLAN
Plan - Proposed
SUBMITTED 10.03.2025 -GA BLOCK A STREET DETAIL ELEVATION
Plan - Proposed
SUMMARY OF FURTHER INFORMATION RECEIVED 002.PDF
!Key Document
SUMMARY OF FURTHER INFORMATION RECEIVED 002_10.06.2025.PDF
!Key Document
SUMMARY OF FURTHER INFORMATION RECEIVED FOLLOWING INITIAL CONSULTATION
!Key Document
SUNLIGHT AND DAYLIGHT RESULTS
Document
SUNLIGHT AND DAYLIGHT RESULTS
Document
SUNLIGHT AND DAYLIGHT RESULTS WITHIN DEVELOPMENT - AS SUBMITTED UNDER REF 24.AP.
Document
SUPERSEDED - CHAMBERS WHARF PHASES 2-4 AMENDMENTS ? NOTE ON THE ENVIRONMENTAL IM
Document
SUPERSEDED - DESIGN AND ACCESS STATEMENT
Document
SUPERSEDED - DESIGN AND ACCESS STATEMENT
Design and Access statement
SUPERSEDED - DESIGN AND ACCESS STATEMENT
Design and Access statement
SUPERSEDED - DESIGN AND ACCESS STATEMENT
Design and Access statement
SUPERSEDED - DESIGN AND ACCESS STATEMENT
Design and Access statement
SUPERSEDED - DESIGN AND ACCESS STATEMENT
Design and Access statement
SUPERSEDED - DESIGN AND ACCESS STATEMENT
Design and Access statement
SUPERSEDED - DESIGN AND ACCESS STATEMENT
Design and Access statement
SUPERSEDED - GA ACCESSIBLE BASEMENT FLOOR PLAN
Plan - Proposed
SUPERSEDED - GA BLOCK A COURTYARD DETAIL ELEVATIONS
Plan - General
SUPERSEDED - GA BLOCK A STREET DETAIL ELEVATION
Plan - General
SUPERSEDED - GA EIGHTH FLOOR PLAN
Plan - General
SUPERSEDED - GA ELEVENTH FLOOR PLAN
Plan - General
SUPERSEDED - GA FIRST FLOOR PLAN
Plan - General
SUPERSEDED - GA FOURTH AND FIFTH FLOOR PLAN
Plan - General
SUPERSEDED - GA GROUND FLOOR PLAN
Plan - General
SUPERSEDED - GA NINTH FLOOR PLAN
Plan - General
SUPERSEDED - GA ROOF PLAN
Plan - General
SUPERSEDED - GA SECOND AND THIRD FLOOR PLAN
Plan - General
SUPERSEDED - GA SEVENTH FLOOR PLAN
Plan - General
SUPERSEDED - GA SIXTH FLOOR PLAN
Plan - General
SUPERSEDED - GA TENTH FLOOR PLAN
Plan - General
SUPERSEDED - GA THIRTEENTH FLOOR PLAN
Plan - General
SUPERSEDED - GA TWELFTH FLOOR PLAN
Plan - General
SUPERSEDED - ILLUSTRATIVE LANDSCAPE PROPOSALS
Plan - General
SUPERSEDED - LETTER -CHAMBERS WHARF ? CONSENTED AND PROPOSED DAYLIGHT AND SUNLIG
Document
SUPERSEDED - PROPOSED AFFORDABLE ELEVATIONS - SOUTH
Plan - Proposed
SUPERSEDED - PROPOSED CONTEXT ELEVATIONS
Plan - Proposed
SUPERSEDED - PROPOSED CONTEXT ELEVATIONS
Plan - Proposed
SUPERSEDED - PROPOSED CONTEXT ELEVATIONS
Plan - Proposed
SUPERSEDED - PROPOSED CONTEXT ELEVATIONS - N&S
Plan - Amended
SUPERSEDED - PROPOSED CONTEXT SECTIONS - AA & BB
Plan - Proposed
SUPERSEDED - PROPOSED CONTEXT SECTIONS - CC & DD
Plan - Proposed
SUPERSEDED - PROPOSED ELEVATIONS - EAST
Plan - Proposed
SUPERSEDED - PROPOSED ELEVATIONS - PUBLIC ROUTE ELEVATION
Plan - Proposed
SUPERSEDED - PROPOSED ELEVATIONS - RIVER WALK ELEVATION
Plan - Proposed
SUPERSEDED - PROPOSED ELEVATIONS - WEST
Plan - Proposed
SUPERSEDED - PROPOSED ELEVATIONS NORTH
Plan - Proposed
SUPERSEDED - PROPOSED LOCATION PLAN
Plan - General
SUPERSEDED - PROPOSED PRIVATE ELEVATION - SOUTH
Plan - Proposed
SUPERSEDED - SUMMARY OF FURTHER INFORMATION RECEIVED 002.PDF
!Key Document
SUSTAINABILITY APPRAISAL
Sustainability appraisal
THAMES WATER
Statutory consultee replies
THAMES WATER
Statutory consultee replies
TIDEWAY
Statutory consultee replies
VALID APPLICATION LETTER WITH INVOICE
Valid Application Letter
WHOLE LIFE CYCLE CARBON EMISSIONS ASSESSMENT
Document