Installation of approximately 2.5 km of 132 kV overhead line between wind energy hub and substation.

Full Proposal

The Proposed Development is for the installation of approximately 2.5 km of 132 kV OHL (Overhead Line), between the proposed Newlands Hill Wind Energy Hub and the 400kV substation within the southern section of the existing Fallago Rig Windfarm