← Back to Rugby Borough Council
Status
Consultation Carried Out
New housing
Received
05 Jun 2025
New dwellings
1,600
What you can do
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.
Summary
Outline for up to 1,600 homes with schools, sports hub, mixed-use centre and infrastructure.
Full Proposal
Outline application for up to 1,600 residential dwellings; a 2 form entry Primary School; a 6 form entry Secondary School and Community Sports Hub including floodlit outdoor sports & changing/social/indoor fitness facilities; healthcare facilities; a mixed use centre containing residential dwellings, supported living facility, up to 11,200 sqm of community and commercial development which could include retail, office, food and drink, nursery/creche, community/public hall and sui generis uses such as drinking establishments and take aways. Supporting development including open space, play areas, public realm, vehicle parking, cycle parking, a mobility hub, landscaping, drainage (all matters reserved except for access).
Full application for part of the Sustainable Transport Link between Homestead Link Road and land to the west; new estate road from the Community Spine Road to land to the north; associated landscaping and drainage. Demolition of parts of Cherry Tree Farm, Windmill Farm and Dunkleys Farm. Change of use of the retained buildings at Dunkleys Farm and Windmill Farm to commercial and community uses listed (included within the 11,200 sqm) as flexible uses under Class V of the GDPO.
Documents
Access and movement parameter plan R'cd 05/06/2025
Plans
Active Travel - 22/08/25
Consultee Comment
Appendix I Outfalls R'cd 05/06/2025
Drainage
Appendix J Greenfield Runoff Rates R'cd 05/06/2025
Drainage
Arboricultural implication study R'cd 05/06/2025
Tree Report/plan
Arboricultural report Part 1 R'cd 05/06/2025
Tree Report/plan
Arboriculture layout sheet 1-15 R'cd 05/06/2025
Tree Report/plan
Arboriculture layout sheet 16-30 R'cd 05/06/2025
Tree Report/plan
Arboriculture layout sheet 31-45 R'cd 05/06/2025
Tree Report/plan
Arboriculture layout sheet 46-62 R'cd 05/06/2025
Tree Report/plan
Arboriculutral report Part 2 R'cd 05/06/2025
Tree Report/plan
Archaeological report PART 1 R'cd 09/06/2025
Archaeology Report
Archaeological report PART 2 R'cd 09/06/2025
Archaeology Report
AttachmentSummary.pdf
General Correspondence
Baseline Biodiversity report R'cd 05/06/2025
Ecology Report
BNG metric R'cd 24/06/2025
Ecology Report
BNG report R'cd 24/06/2025
Ecology Report
Boundary Plan R'cd 05/06/2025
Site Plan
Building heights paramater plan R'cd 05/06/2025
Plans
Design and access statement R'cd 05/06/2025
Superseded
Design and access statement R'cd 21/10/2025 (changes to pages 79, 80 147)
Design and Access Statement
Design Code R'cd 05/06/2025
Design and Access Statement
Design Code Tracker
Supporting Information
Drainage Calculations R'cd 05/06/2025
Drainage
Drainage Calculations R'cd 05/06/2025
Drainage
Drainage strategy R'cd 05/06/2025
Drainage
Drainage Technical note - 10/10/25
Drainage
Energy Statement R'cd 05/06/2025
Sustainability Checklist
Environmental Health/Aecom (Air Quality) - 24/09/25
Consultee Comment
Environmental Health/Aecom (GeoEnv) - 23/09/25
Consultee Comment
Environmental statement appendices 1.1-1.5 R'cd 05/06/2025
Environmental Statement
Environmental Statement appendix 10 Part 1 R'cd 05/06/2025
Environmental Statement
Environmental Statement appendix 10 Part 2 R'cd 05/06/2025
Environmental Statement
Environmental Statement appendix 10 Part 4 R'cd 05/06/2025
Environmental Statement
Environmental statement Vol 3 R'cd 05/06/2025
Environmental Statement
Environmental statement Vol 3 R'cd 05/06/2025
Environmental Statement
Environmental statement Vol 3 R'cd 05/06/2025
Environmental Statement
Environmental statement Vol 3 R'cd 05/06/2025
Environmental Statement
Environmental statement Vol 4 R'cd 05/06/2025
Environmental Statement
Environmental statement Vol 4 R'cd 05/06/2025
Environmental Statement
Environmental statement Vol 4 R'cd 05/06/2025
Environmental Statement
Environmental statement Vol 4 R'cd 05/06/2025
Environmental Statement
Environmental statement Vol 4 R'cd 05/06/2025
Environmental Statement
Environmental statement Vol 4 R'cd 05/06/2025
Environmental Statement
Environmental statement Vol 4 R'cd 05/06/2025
Environmental Statement
Environmental statement Vol 4 R'cd 05/06/2025
Environmental Statement
Environmental statement volume 2
Environmental Statement
Environmental statement volume 1 R'cd 05/06/2025
Environmental Statement
Environmental statement volume 3 appendix 6 R'cd 05/06/2025
Environmental Statement
Environmental statement volume 3 appendix 7 R'cd 05/06/2025
Environmental Statement
Environmental statement volume 3 appendix 8 R'cd 05/06/2025
Environmental Statement
Estate Road Cross sections R'cd 05/06/2025
Highway plans/information
Estate Road Drainage catchments R'cd 05/06/2025
Drainage
Estate Road Drainage general arrangement R'cd 05/06/2025
Drainage
Estate Road Drainage General arrangement R'cd 05/06/2025
Drainage
Estate Road Drainage sections R'cd 05/06/2025
Drainage
Estate road Landscape plan R'cd 05/06/2025
Landscaping
Estate Road Lighting general arrangement R'cd 05/06/2025
Plans
Estate Road Sections R'cd 05/06/2025
Highway plans/information
Estate Road Speed limit layout R'cd 05/06/2025
Highway plans/information
Estate Road Vehicle tracking R'cd 05/06/2025
Highway plans/information
EV pages from Transport Assessment & Design Code
Supporting Information
Evironmental Statement appendix 10 Part 3 R'cd 05/06/2025 - Comes up with an error message however can still open
Environmental Statement
Existing ditches plan R'cd 05/06/2025
Drainage
Exploratory Hole Location Plan and Soak away test results R'cd 05/06/2025
Drainage
Financial viability assessment R'cd 05/06/2025
Superseded
FInancial viability assessment R'cd 24/10/2025
Supporting Information
Flood maps R'cd 05/06/2025
Drainage
Flood Risk assessment and Drainage strategy R'cd 05/06/2025
Flood Risk Assessment
Flow estimation record R'cd 05/06/2025
Drainage
Foul water strategy R'cd 05/06/2025
Drainage
HE_3-7-25.pdf
Photographs
Heritage Desk-Based Assessment, R'cd 05/06/2025
Heritage Statement
Historic Borehole records R'cd 05/06/2025
Drainage
Historical land use and contamination report R'cd 05/06/2025
Supplementary Report
Hydraulic Modelling Report R'cd 05/06/2025
Drainage
Illustrative Masterplan R'cd 05/06/2025
Site Plan
Index of appendices, R'cd 05/06/2025
Environmental Statement
Index of figures R'cd 05/06/2025
Environmental Statement
Land use parameter plan R'cd 05/06/2025
Superseded
Land use parameter plan R'cd 24/09/2025
Amended Plans
Maintenance Schedules R'cd 05/06/2025
Drainage
MEETING NOTES R'cd 05/06/2025
Drainage
Natural capital assessment R'cd 05/06/2025
Ecology Report
Other relevant information_included_in_Additional plans.pdf
General Correspondence
Outfall rates R'cd 05/06/2025
Drainage
Overland Flow Routing plan R'cd 05/06/2025
Drainage
Overview R'cd 05/06/2025
Drainage
Phasing (pages from Design & Access Statement)
Design and Access Statement
Planning cover letter R'cd 05/06/2025
Planning Statement
Planning statement R'cd 05/06/2025
Planning Statement
PROW Layout plan R'cd 05/06/2025
Superseded
PROW Layout plan R'cd 16/09/2025
Amended Plans
Redacted Application form R'cd 05/06/2025
Application Form
Road safety audit R'cd 08/07/2025
Highway plans/information
Road safety audit response R'cd 08/07/2025
Highway plans/information
Road safety audit response report R'cd 15/07/2025
Highway plans/information
Severn trent correspondence R'cd 05/06/2025
Drainage
Severn trent correspondence R'cd 05/06/2025
Drainage
Sewer Records R'cd 05/06/2025
Drainage
Sewer records R'cd 05/06/2025
Drainage
Site clearance photos R'cd 08/07/2025
Supporting Information
Site clearance plan incl buildings R'cd 05/06/2025
Plan
Site wide regulating plan R'cd 05/06/2025
Plans
SPD complaince statement
Supporting Information
Speed limits R'cd 05/06/2025
Highway plans/information
Sport England - 15/08/25
Consultee Comment
Statement of community engagement R'cd 05/06/2025
Planning Statement
Surface water drainage catchments plan R'cd 05/06/2025
Drainage
Surface water drainage layout overview R'cd 05/06/2025
Drainage
Surface water drainage R'cd 05/06/2025
Drainage
Surface Water overview R'cd 05/06/2025
Drainage
Sustainability statement R'cd 05/06/2025
Sustainability Checklist
Swale detail plan R'cd 05/06/2025
Highway plans/information
The Elms access plan plan R'cd 05/06/2025
Highway plans/information
The Elms access vehicle tracking plan R'cd 05/06/2025
Highway plans/information
Transport assessment appendixes R'cd 05/06/2025
Transport Report
Transport assessment main text R'cd 05/06/2025
Transport Report
Utilities plan R'cd 05/06/2025
Plan
Utilities Plan R'cd 05/06/2025
General Correspondence
Utilities statement R'cd 05/06/2025
Supplementary Report
Utilities statement R'cd 05/06/2025
Supplementary Report
Utilities surveys R'cd 05/06/2025
General Correspondence
WEST ZONE Water drainage catchments R'cd 05/06/2025
Drainage
Windmill street drainage catchments R'cd 05/06/2025
Drainage
Windmill street exisitng and proposed levels R'cd 05/06/2025
Drainage
Windmill street general arrangement and layout R'cd 05/06/2025
Plans
Windmill street general drainage arrangement R'cd 05/06/2025
Drainage
Windmill street general lighting arrangement R'cd 05/06/2025
Plans
Windmill Street Landscape General Arrangement Overview R'cd 05/06/2025
Landscaping
WINDMILL STREET PHASING PLAN R'cd 05/06/2025
Plan
Windmill street proposed levels R'cd 05/06/2025
Sections
Windmill street proposed long sections R'cd 05/06/2025
Sections
Windmill Street sections R'cd 05/06/2025
Sections
Windmill street vehicle tracking R'cd 05/06/2025
Highway plans/information
Written Scheme of Investigation for archaeological evaluations, R'cd 05/06/2025
Archaeology Report