← Back to London Borough of Redbridge

Status

Decision Despatched New housing
Received 03 Sep 2025
New dwellings 9

What you can do

Take Action

Make your voice heard. Authorities need to hear from people who support new homes.

Summary

Four-storey building providing nine flats with landscaping, cycle parking, refuse storage, balconies and amenity space.

Full Proposal

Erection of a four storey building to contain 9no. (2 x 2 bedroom, 2 x 3 bedroom and 5 x 1 bedroom) self-contained flats with associated soft landscaping / boundary planting, cycle parking, waste / refuse storage, balconies, terraces and amenity space. (Summary).

Reasonable Objection Grounds

These are planning grounds where objections may be reasonable for this application:

Traffic Privacy Light Noise Scale

Likely Support Reasons

These are potential reasons to support this application based on the proposal:

Housing Need Brownfield Density

Detail pages

Documents

Airquality.pdf
Air quality assessment
Not downloaded · Council link
Arboricultural Appraisal
Tree survey
Not downloaded · Council link
Biodiversity gain plan
Biodiversity report
Not downloaded · Council link
Biodiversity Net Gain Report
Biodiversity report
Not downloaded · Council link
BNG Metric
Biodiversity report
Not downloaded · Council link
CIL Land at RO 65 Cambridge Park 2025.pdf
CIL supporting document
Not downloaded · Council link
Completed HRA_Redacted.pdf
S106
Not downloaded · Council link
DAS 65 Cambridge Park Road Wanstead London E11 2UA.pdf
Design and access statement
Not downloaded · Council link
DAS 65 CAMBRIDGE PARK.pdf
Design and access statement
Not downloaded · Council link
Daylight/sunlight for previous scheme at 5 storeys
Sunlight/daylight assessment
Not downloaded · Council link
dn 65.pdf
Decision notice
Not downloaded · Council link
Email from agent 10.12.25
Sunlight/daylight assessment
Not downloaded · Council link
Internal assessment
Sunlight/daylight assessment
Not downloaded · Council link
or65.pdf
Officer report
Not downloaded · Council link
PFSS 65 cambrdige park.pdf
Fire statement
Not downloaded · Council link
Proposed roof Plan.pdf
Proposed plan - roof plan
Not downloaded · Council link
Segment 001 of EXISTING DRAWINGS.pdf
Site/block plan
Not downloaded · Council link
Segment 001 of PROPOSED DRAWINGS.pdf
Proposed plan - floor plan
Not downloaded · Council link
Segment 002 of EXISTING DRAWINGS.pdf
Existing plan - floor plan
Not downloaded · Council link
Segment 002 of PROPOSED DRAWINGS.pdf
Proposed plan - floor plan
Not downloaded · Council link
Segment 003 of EXISTING DRAWINGS.pdf
Existing plan - floor plan
Not downloaded · Council link
Segment 003 of PROPOSED DRAWINGS.pdf
Proposed plan - floor plan
Not downloaded · Council link
Segment 004 of EXISTING DRAWINGS.pdf
Existing plan - elevation
Not downloaded · Council link
Segment 004 of PROPOSED DRAWINGS.pdf
Proposed plan - floor plan
Not downloaded · Council link
Segment 005 of PROPOSED DRAWINGS.pdf
Proposed plan - elevation
Not downloaded · Council link
Segment 006 of PROPOSED DRAWINGS.pdf
Proposed plan - elevation
Not downloaded · Council link
Segment 007 of PROPOSED DRAWINGS.pdf
Proposed plan - elevation
Not downloaded · Council link
Segment 008 of PROPOSED DRAWINGS.pdf
Proposed plan - elevation
Not downloaded · Council link
Segment 009 of PROPOSED DRAWINGS.pdf
Proposed plan - elevation
Not downloaded · Council link
Segment 010 of PROPOSED DRAWINGS.pdf
Proposed plan - elevation
Not downloaded · Council link
Segment 011 of PROPOSED DRAWINGS.pdf
Proposed plan
Not downloaded · Council link
Transport Assesment revised 65 Cambridge Park.pdf
Transport assessment
Not downloaded · Council link
Updated Application Form Revised Unit Mix 65 Cambridge Park.pdf
Application form
Not downloaded · Council link
WASTE MANAGEMENT PLAN
Supporting document
Not downloaded · Council link