← Back to London Borough of Redbridge
Status
Decision Despatched
New housing
Received
03 Sep 2025
New dwellings
9
What you can do
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.
Summary
Four-storey building providing nine flats with landscaping, cycle parking, refuse storage, balconies and amenity space.
Full Proposal
Erection of a four storey building to contain 9no. (2 x 2 bedroom, 2 x 3 bedroom and 5 x 1 bedroom) self-contained flats with associated soft landscaping / boundary planting, cycle parking, waste / refuse storage, balconies, terraces and amenity space. (Summary).
Reasonable Objection Grounds
These are planning grounds where objections may be reasonable for this
application:
Traffic
Privacy
Light
Noise
Scale
Likely Support Reasons
These are potential reasons to support this application based on the
proposal:
Housing Need
Brownfield
Density
Documents
Airquality.pdf
Air quality assessment
Arboricultural Appraisal
Tree survey
Biodiversity gain plan
Biodiversity report
Biodiversity Net Gain Report
Biodiversity report
BNG Metric
Biodiversity report
CIL Land at RO 65 Cambridge Park 2025.pdf
CIL supporting document
Completed HRA_Redacted.pdf
S106
DAS 65 Cambridge Park Road Wanstead London E11 2UA.pdf
Design and access statement
DAS 65 CAMBRIDGE PARK.pdf
Design and access statement
Daylight/sunlight for previous scheme at 5 storeys
Sunlight/daylight assessment
dn 65.pdf
Decision notice
Email from agent 10.12.25
Sunlight/daylight assessment
Internal assessment
Sunlight/daylight assessment
PFSS 65 cambrdige park.pdf
Fire statement
Proposed roof Plan.pdf
Proposed plan - roof plan
Segment 001 of EXISTING DRAWINGS.pdf
Site/block plan
Segment 001 of PROPOSED DRAWINGS.pdf
Proposed plan - floor plan
Segment 002 of EXISTING DRAWINGS.pdf
Existing plan - floor plan
Segment 002 of PROPOSED DRAWINGS.pdf
Proposed plan - floor plan
Segment 003 of EXISTING DRAWINGS.pdf
Existing plan - floor plan
Segment 003 of PROPOSED DRAWINGS.pdf
Proposed plan - floor plan
Segment 004 of EXISTING DRAWINGS.pdf
Existing plan - elevation
Segment 004 of PROPOSED DRAWINGS.pdf
Proposed plan - floor plan
Segment 005 of PROPOSED DRAWINGS.pdf
Proposed plan - elevation
Segment 006 of PROPOSED DRAWINGS.pdf
Proposed plan - elevation
Segment 007 of PROPOSED DRAWINGS.pdf
Proposed plan - elevation
Segment 008 of PROPOSED DRAWINGS.pdf
Proposed plan - elevation
Segment 009 of PROPOSED DRAWINGS.pdf
Proposed plan - elevation
Segment 010 of PROPOSED DRAWINGS.pdf
Proposed plan - elevation
Segment 011 of PROPOSED DRAWINGS.pdf
Proposed plan
Transport Assesment revised 65 Cambridge Park.pdf
Transport assessment
Updated Application Form Revised Unit Mix 65 Cambridge Park.pdf
Application form
WASTE MANAGEMENT PLAN
Supporting document