← Back to North Norfolk District Council
Status
Pending Consideration
Received
17 Oct 2025
New dwellings
n/a
What you can do
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.
Summary
Demolition, restoration, conversion to six units and construction of 20 new 2–4 bedroom houses.
Full Proposal
Demolition of existing detached school buildings & parts of C20th extensions to original Highfield House. Repairs & restorations to original Highfield House & retained extensions with reinstatement of original plan form to Highfield House. Retention & conversion of two detached C20th two storey classroom blocks. Change of use of these buildings to create six residential units only. Construction of 20 new terraced, semi-detached & detached 2, 3 & 4 bedroom houses
Reasonable Objection Grounds
These are planning grounds where objections may be reasonable for this
application:
Traffic
Privacy
Light
Scale
Character
Likely Support Reasons
These are potential reasons to support this application based on the
proposal:
Housing Need
Brownfield
Density
Documents
Affordable housing statement
Report / Statement
Application form
Application Form
Bng condition assessment
Supporting Document
Bng metric calc tool
Supporting Document
Bng statement
Report / Statement
Bng statement
Report / Statement
Details of car ports: plots 22-26 plans & elevations as proposed
Plan
Ecological impact assessment
Report / Statement
Elected member response
Consultee Comment
Environmental health response
Consultee Comment
Environmental noise assessment
Report / Statement
Existing ground floor plans showing abutment demolitions
Plan
Flood risk assessment and drainage strategy
Report / Statement
Heritage assessment and impact statement
Report / Statement
Highways response
Consultee Comment
Landscape response
Consultee Comment
Lead local flood authority
Consultee Comment
Letter confirming statutory metric baseline
Correspondence
Minerals & waste response
Consultee Comment
Nutrient neutrality assessment report
Report / Statement
Phase 1 contamination report pt 1
Report / Statement
Phase 1 contamination report pt 2
Report / Statement
Phase 1 contamination report pt 3
Report / Statement
Planning policy response
Consultee Comment
Planning statement
Report / Statement
Planning statement incorporating local validation requirements statement
Report / Statement
Plots 10-18 attic floor plans
Plan
Plots 10-18 proposed elevations
Plan
Plots 19/20 & 21/22: floor plans as proposed
Plan
Plots 19/20, 21/22: elevations as proposed
Plan
Plots 23 & 25: elevations as proposed
Plan
Plots 23 & 25: floor plans as proposed
Plan
Plots 24 & 26: floor plans as proposed
Plan
Plots 24 & 26: floor plans as proposed
Plan
Plots 7, 8 & 9: elevations as proposed
Plan
Plots 7, 8, 9: floor plans as proposed
Plan
Pre-app advice report
Supporting Document
Proposed access and highway layout
Plan
Proposed block plan
Superseded Document or Plan
Proposed block plan
Revised Plan
Proposed first & second floor plans
Plan
Retained buildings: elevations as existing
Plan
Retained buildings: elevations as proposed
Plan
Retained buildings: first floor plans as proposed
Plan
Retained buildings: plots 1-6; ground floor plans as proposed
Plan
Retained structures: first floor plan as existing showing abutment demolitions
Plan
Schedule of repairs to highfield house
Report / Statement
Shadow habitats regulations assessment
Report / Statement
Site notice
Supporting Document
Studio b: east elevation main block: elevations x & y as existing
Plan
Studio block b: east elevation; main block: elevations x & y as proposed
Plan
Topographical survey
Plan
Town council response
Consultee Comment