Summary
Phased redevelopment: demolition, new office buildings, flexible commercial and community uses, landscaping, infrastructure.
Full Proposal
Phased development comprising: Phase A - demolition of existing buildings and structures, erection of a basement (C1 Building and C2 Building) and a podium across lower ground and upper ground floors comprising flexible commercial space (Class E and/or Sui Generis drinking establishment), erection of a building (C1 Building) to form offices (Class E), landscaping works, highways, access, servicing, infrastructure and other associated works; Phase B: erection of a podium across lower ground and upper ground floors and a new building (C2 Building) to form offices (Class E) and flexible commercial and community uses (Class E, F2 and/ or Sui Generis drinking establishment), alterations to the existing Sculptural Wall (Hollaway Wall), relocation of existing art work, landscaping works, highways, access, servicing, infrastructure and other associated works; Phase C - change of use and associated works to railway Viaduct arches to form flexible commercial units (Class E, and/ or Sui Generis - drinking establishment) including highways, access and servicing arrangements, and other associated works.
Documents
20TH CENTURY SOCIETY
Consultee Comment
ACCOMMODATION SCHEDULE
Supporting Information
ACOUSTICS REPORT
Noise assessment or information
ACTIVE TRAVEL ENGLAND
Consultee Comment
ADDITIONAL INFORMATION COVERING LETTER
Correspondence
ALTRINCHAM STREET VIADUCT
Drawing - Proposed
ALTRINCHAM STREET VIADUCT
Drawing - Existing
ALTRINCHAM STREET VIADUCT - FABRIC ALTERATIONS
Drawing - Proposed
ALTRINCHAM STREET VIADUCT NORTH & SOUTH ELEVATION
Drawing - Proposed
ANNOTATED
Drawing - Site Plan
APPLICATION FORM - WITHOUT PERSONAL DATA
Application Form
ARBORICULTURAL IMPACT ASSESSMENT
Supporting Information
ARCHAEOLOGICAL ASSESSMENT
Supporting Information
AVIATION SAFEGUARDING TECHNICAL NOTE
Supporting Information
BASEMENT PLAN
Drawing - Proposed
BAY STUDY C1 ALTRINCHAM STREET ENTRANCE (NORTH)
Drawing - Proposed
BAY STUDY C1 LINEAR TOWER (WEST)
Drawing - Proposed
BAY STUDY C1 MILL LANE (SOUTH)
Drawing - Proposed
BAY STUDY C1 SQUARE ENTRANCE (WEST)
Drawing - Proposed
BAY STUDY C2 ALTRINCHAM STREET MANCHESTER ROOM (NORTH)
Drawing - Proposed
BAY STUDY C2 LONDON ROAD (EAST)
Drawing - Proposed
BAY STUDY C2 MILL LANE (SOUTH)
Drawing - Proposed
BROADBAND CONNECTIVITY SURVEY
Supporting Information
C1 & C2 NORTH ELEVATION
Drawing - Proposed
C1 & C2 SOUTH ELEVATION
Drawing - Proposed
C1 EAST ELEVATION
Drawing - Proposed
C1 WEST ELEVATION
Drawing - Proposed
C2 EAST ELEVATION
Drawing - Proposed
C2 WEST ELEVATION
Drawing - Proposed
CERTIFICATE C NOTICE CONFIRMATION
Supporting Information
CIRCULAR ECONOMY STATEMENT
Supporting Information
COMPOSITE GROUND FLOOR PLAN
Drawing - Proposed
CONTEXT EAST ELEVATION - LONDON ROAD
Drawing - Existing & Proposed
CONTEXT NORTH ELEVATION - ALTRINCHAM STREET
Drawing - Existing & Proposed
CONTEXT SOUTH ELEVATION - MILL LANE
Drawing - Existing & Proposed
CONTEXT WEST ELEVATION - THE SQUARE
Drawing - Existing & Proposed
COVERING LETTER
Correspondence
CRIME IMPACT STATEMENT
Supporting Information
DEMOLITION PLAN
Drawing - Proposed
DESIGN & ACCESS STATEMENT
Design & Access Statement
DESIGN & ACCESS STATEMENT ADDENDUM
Design & Access Statement
DESK-BASKED SATELLITE TV INTERFERENCE ASSESSMENT
Supporting Information
DETAILED UXO RISK ASSESSMENT
Supporting Information
DRAFT
Section 106 Agreement
DRAINAGE LANDSCAPE TECHNICAL NOTE
Flood Risk Assessment or Drainage
DRAINAGE STRATEGY
Flood Risk Assessment or Drainage
ECOLOGICAL IMPACT ASSESSMENT
Ecology report
ECOLOGY LANDSCAPING TECHNICAL NOTE
Ecology report
EIA ADDENDUM (VOL 1)
Environmental Statement
ENERGY & CARBON PROFORMA
Supporting Information
ENV AGENCY
Consultee Comment
ENVIRONMENTAL STANDARDS STATEMENT AND ENERGY & CARBON STATEMENT
Supporting Information
ES VOL 1 MAIN REPORT
Environmental Statement
ES VOL 2 APPENDIX 10.1 DETAILED WIND MICROCLIMATE METHODOLOGY
Environmental Statement
ES VOL 2 APPENDIX 10.2 WIND MICROCLIMATE CFD RESULTS
Environmental Statement
ES VOL 2 APPENDIX 11.1 SOLAR GLARE METHODOLOGY
Environmental Statement
ES VOL 2 APPENDIX 11.2 SOLAR GLARE ASSESSMENT
Environmental Statement
ES VOL 2 APPENDIX 12.1 GUIDANCE & REGULATION
Environmental Statement
ES VOL 2 APPENDIX 12.2 ASSESSING THE OUTCOMES FOR HEALTH & WELLBEING
Environmental Statement
ES VOL 2 APPENDIX 12.3 HEALTH DETERMINANTS AND THEIR RELEVANCE TO THE PROPOSED D
Environmental Statement
ES VOL 2 APPENDIX 12.4 ASSESSMENT OF HEALTH DETERMINANTS
Environmental Statement
ES VOL 2 APPENDIX 14.1 CONSTRUCTION TRAFFIC INFORMATION
Environmental Statement
ES VOL 2 APPENDIX 14.2 CONSTRUCTION STAGE IMPACTS
Environmental Statement
ES VOL 2 APPENDIX 14.3 OPERATIONAL STAGE IMPACTS
Environmental Statement
ES VOL 2 APPENDIX 14.4 CUMULATIVE ASSESSMENT
Environmental Statement
ES VOL 2 APPENDIX 14.5 IDM MASTERPLAN ASSESSMENT WITH CUMULATIVE TRIPS
Environmental Statement
ES VOL 2 APPENDIX 14.6 SCOPING IN-OUT OF CUMULATIVE SITES
Environmental Statement
ES VOL 2 APPENDIX 14.7 FEAR & INTIMIDATION CONSTRUCTION STAGE CALCULATIONS
Environmental Statement
ES VOL 2 APPENDIX 14.8 TRANSPORT ASSESSMENT
Environmental Statement
ES VOL 2 APPENDIX 15.1 DRAWINGS (SCENARIO 1) -21766-REL02-IS01-DS-01-EXI_PLN
Environmental Statement
ES VOL 2 APPENDIX 15.1 DRAWINGS (SCENARIO 1)- 21766-REL02-IS01-DS-02-EXI_3D
Environmental Statement
ES VOL 2 APPENDIX 15.1 DRAWINGS (SCENARIO 1)- 21766-REL02-IS01-DS-03-EXI_3D
Environmental Statement
ES VOL 2 APPENDIX 15.1 DRAWINGS (SCENARIO 2)- 21766-REL02-IS01-DS-04-PROP_PLN
Environmental Statement
ES VOL 2 APPENDIX 15.1 DRAWINGS (SCENARIO 2)- 21766-REL02-IS01-DS-05-PROP_3D
Environmental Statement
ES VOL 2 APPENDIX 15.1 DRAWINGS (SCENARIO 2)- 21766-REL02-IS01-DS-06-PROP_3D
Environmental Statement
ES VOL 2 APPENDIX 15.1 DRAWINGS (SCENARIO 5)- 21766-REL02-IS02-DS-04-PROP_PLN
Environmental Statement
ES VOL 2 APPENDIX 15.1 DRAWINGS (SCENARIO 5)- 21766-REL02-IS02-DS-05-PROP_3D
Environmental Statement
ES VOL 2 APPENDIX 15.1 DRAWINGS (SCENARIO 5)-21766-REL02-IS02-DS-06-PROP_3D
Environmental Statement
ES VOL 2 APPENDIX 15.2 DAYLIGHT & SUNLIGHT RESULTS (SCENARIO 1 V 2)- 21766_2__1_
Environmental Statement
ES VOL 2 APPENDIX 15.2 DAYLIGHT & SUNLIGHT RESULTS (SCENARIO 1 V 2)-21766_2_1_DS
Environmental Statement
ES VOL 2 APPENDIX 15.2 DAYLIGHT & SUNLIGHT RESULTS (SCENARIO 1 V 5)-21766_2_2_DS
Environmental Statement
ES VOL 2 APPENDIX 15.2 DAYLIGHT & SUNLIGHT RESULTS (SCENARIO 1 V 5)-21766_2__2_N
Environmental Statement
ES VOL 2 APPENDIX 15.3 OVERSHADOWING RESULTS (SCENARIO 1)- JUNE- PHASE 2 SHOG JU
Environmental Statement
ES VOL 2 APPENDIX 15.3 OVERSHADOWING RESULTS (SCENARIO 1)- MARCH-PHASE 2 SHOG MA
Environmental Statement
ES VOL 2 APPENDIX 15.3 OVERSHADOWING RESULTS (SCENARIO 2)- JUNE-SHOG JUNE PROPOS
Environmental Statement
ES VOL 2 APPENDIX 15.3 OVERSHADOWING RESULTS (SCENARIO 2)- MARCH-PHASE 1 SHOG MA
Environmental Statement
ES VOL 2 APPENDIX 15.3 OVERSHADOWING RESULTS (SCENARIO 5)- JUNE-PHASE 2 SHOG JUN
Environmental Statement
ES VOL 2 APPENDIX 15.3 OVERSHADOWING RESULTS (SCENARIO 5)- MARCH-PHASE 2 SHOG MA
Environmental Statement
ES VOL 2 APPENDIX 16.1 BASELINE NOISE AND VIBRATION SURVEY
Environmental Statement
ES VOL 2 APPENDIX 16.2 PRELIMINARY NOISE MANAGEMENT PLAN
Environmental Statement
ES VOL 2 APPENDIX 17.1 CIVIC EARTH 2025 SISTER - PLOT C AND ENABLING WORKS AREA.
Environmental Statement
ES VOL 2 APPENDIX 17.2 SITE INVESTIGATION REPORT
Environmental Statement
ES VOL 2 APPENDIX 2.1 EIA SCOPING REPORT
Environmental Statement
ES VOL 2 APPENDIX 2.2 EIA SCOPING OPINION
Environmental Statement
ES VOL 2 APPENDIX 2.3 COMMITTED DEVELOPMENT MAP
Environmental Statement
ES VOL 2 APPENDIX 2.4 EIA SCOPING SUMMARY OF COMMENTS, RESPONSES & UPDATES
Environmental Statement
ES VOL 2 APPENDIX 5.1 HOARDING LAYOUT
Environmental Statement
ES VOL 2 APPENDIX 6.1 HERITAGE STATEMENT
Environmental Statement
ES VOL 2 APPENDIX 7.1 TABLES
Environmental Statement
ES VOL 2 APPENDIX 7.2 VISUAL BASELINE & ASSESSMENT
Environmental Statement
ES VOL 2 APPENDIX 7.3 TOWNSCAPE BASELINE & ASSESSMENT
Environmental Statement
ES VOL 2 APPENDIX 7.4 AVR METHODOLOGY
Environmental Statement
ES VOL 2 APPENDIX 8.1 LEGISLATION, POLICY & GUIDANCE
Environmental Statement
ES VOL 2 APPENDIX 8.2 CONSTRUCTION DUST RISK ASSESSMENT
Environmental Statement
ES VOL 2 APPENDIX 8.3 AIR QUALITY ASSESSMENT APPENDICES
Environmental Statement
ES VOL 2 APPENDIX 9.1 CLIMATE CHANGE RESILIENCE RISK ASSESSMENT
Environmental Statement
ES VOL 2 APPENDIX 9.2 GREENHOUSE GAS CALCULATION INPUTS
Environmental Statement
ES VOL 2 APPENDIX 9.3 SCOPE 3 EMISSIONS CONSIDERATIONS
Environmental Statement
ES VOL 2 APPENDIX 9.4 LEGISLATION, POLICY AND GUIDANCE
Environmental Statement
EVENT STRATEGY
Supporting Information
FLOOD RISK ASSESSMENT
Flood Risk Assessment or Drainage
FLOOD SEQUENTIAL TEST
Flood Risk Assessment or Drainage
FRAMEWORK TRAVEL PLAN
Transport or Travel information
GREEN & BLUE INFRASTRUCTURE STATEMENT
Supporting Information
HERITAGE NOTE - RENOLD LISTING
Heritage Statement
HISTORIC ENGLAND
Consultee Comment
HOLLAWAY WALL STRUCTURAL APPRAISAL & OUTLINE METHODOLOGY REPORT
Supporting Information
HOLLOWAY PLACE APPROACH
Drawing - Proposed
HOLLOWAY WALL - EXISTING CONDITION
Drawing - Existing
HOLLOWAY WALL - FABRIC ALTERATION
Drawing - Proposed
HOLLOWAY WALL - PROPOSED CONDITION
Drawing - Proposed
HOLLOWAY WALL HERITAGE RESPONSE
Heritage Statement
LANDSCAPE GA PLAN
Drawing - Proposed
LANDSCAPE LEVELS
Drawing - Proposed
LANDSCAPE SECTIONS AA & BB
Drawing - Proposed
LANDSCAPE SECTIONS CC, DD & EE
Drawing - Proposed
LEVEL 01 PLAN
Drawing - Proposed
LEVEL 02 PLAN
Drawing - Proposed
LEVEL 10 PLAN
Drawing - Proposed
LEVEL 11 PLAN
Drawing - Proposed
LEVEL 18 PLAN
Drawing - Proposed
LEVEL 19 PLAN
Drawing - Proposed
LEVEL 20 PLAN
Drawing - Proposed
LEVEL 6 PLAN
Drawing - Proposed
LEVELS
Drawing - Existing
LOCAL LABOUR AGREEMENT
Supporting Information
LOWER GF PLAN
Drawing - Proposed
MAN AIRPORT
Consultee Comment
MANCHESTER ROOM APPROACH
Drawing - Proposed
MCC ENV HEALTH
Consultee Comment
MCC ENV HEALTH
Consultee Comment
MCC ENV HEALTH
Consultee Comment
MCC ENV HEALTH
Consultee Comment
MCC ENV HEALTH
Consultee Comment
MCC FLOOD RISK MANAGEMENT
Consultee Comment
MCC HIGHWAYS
Consultee Comment
MCC HIGHWAYS
Consultee Comment
MCC HIGHWAYS
Consultee Comment
MCC WORK & SKILLS TEAM
Consultee Comment
MILL LANE APPROACH
Drawing - Proposed
NETWORK RAIL
Consultee Comment
OBJECTS (REDACTED-NON PA COMMENTS)
Public Comment
OPERATIONAL WASTE MANAGEMENT & SERVICING STRATEGY
Waste Management
OUTLINE OPERATIONAL MANAGEMENT STRATEGY
Supporting Information
PLACEMAKING STRATEGY
Supporting Information
PLANNING & TALL BUILDING STATEMENT
Supporting Information
PLANNING & TALL BUILDING STATEMENT ADDENDUM
Supporting Information
PUBLIC ART APPENDIX 3 M&G EXPLORATORY STUDY REPORT
Supporting Information
PUBLIC ART STRATEGY
Supporting Information
ROOF PLAN
Drawing - Proposed
SECTION A
Drawing - Proposed
SECTION B
Drawing - Proposed
SECTION C
Drawing - Proposed
SECTION D
Drawing - Proposed
SECTION E
Drawing - Proposed
SITE PHASING PLANS & SECTIONS
Drawing - Site Plan
SOLAR GLARE TECHNICAL NOTE
Daylight & Sunlight assessment
STATEMENT OF CONSULTATION
Supporting Information
STATUTORY BNG METRIC
Ecology report
TERRESTRIAL TV BASELINE SURVEY
Supporting Information
TOPOGRAPHICAL SURVEY
Supporting Information
TRANSPORT ASSESSMENT
Transport or Travel information
TVIA DESIGN & LANDSCAPING TECHNICAL NOTE
Supporting Information
TYPICAL LOWER LEVEL PLAN (03-05)
Drawing - Proposed
TYPICAL MID LEVEL PLAN (07-09)
Drawing - Proposed
TYPICAL UPPER LEVEL PLAN (12-17)
Drawing - Proposed
TYPICAL VIADUCT ARCH
Drawing - Proposed
UPPER GROUND FLOOR PLAN
Drawing - Proposed
VENTILATION STATEMENT
Supporting Information
VIADUCT ARCH 4
Drawing - Proposed
WASTE PROFORMA
Waste Management
WHOLE LIFE CARBON REPORT
Supporting Information
WIND DESIGN AND LANDSCAPING TECHNICAL NOTE
Supporting Information