← Back to Malvern Hills District Council
Application
M/25/00736/LB
Malvern Hills District Council · MASTERGOV
Status
Pending Decision
Community facility
Received
23 Jul 2025
New dwellings
0
What you can do
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.
Summary
Listed building works: replace terrace surface/railings, add condenser and canopy, internal staff room and toilet alterations.
Full Proposal
Replacement of existing external terrace surface / roof over basement level and erection of replacement balustrade railings to rear. Addition of condenser to external south facing wall. Replacement of canopy to front elevation. Internal alterations to create staff room and staff toilet. Infill internal window aperture to south facing wall.
Detail pages
- View live detail on council site
- No archived detail page available.
Documents
-
Document
Not downloaded
· Council link
-
Document
Not downloaded
· Council link
-
Document
Not downloaded
· Council link
-
Document
Not downloaded
· Council link
-
Document
Not downloaded
· Council link
-
Document
Not downloaded
· Council link
-
Document
Not downloaded
· Council link
-
Document
Not downloaded
· Council link
-
Document
Not downloaded
· Council link
-
Document
Not downloaded
· Council link
-
Document
Not downloaded
· Council link
050 - A
Document
Not downloaded
· Council link
100 - A
Document
Not downloaded
· Council link
100 - B
Document
Not downloaded
· Council link
200 - B
Document
Not downloaded
· Council link
200 - E
Document
Not downloaded
· Council link
201 - B
Document
Not downloaded
· Council link
2804 500 / -
Document
Not downloaded
· Council link
301 - D
Document
Not downloaded
· Council link
3335-OSE-V1-01-DR-S-0001(C1) -
Document
Not downloaded
· Council link
TP16343_24.01 - C
Document
Not downloaded
· Council link