← Back to Hammersmith & Fulham

Status

Pending Consideration
Received n/a
New dwellings n/a

What you can do

Take Action

Make your voice heard. Authorities need to hear from people who support new homes.

Summary

Change of use of five-storey office building to 68 self-contained residential dwellings.

Full Proposal

Change of use of an existing five storey office building from a commercial and business use (Class E) into a residential use (Class C3) consisting of 68no. self-contained dwellings, comprising of 40no. one bedroom flats, 15no. two bedroom flats, 10no. three bedroom flats and 3no. four bedroom flats.

Reasonable Objection Grounds

These are planning grounds where objections may be reasonable for this application:

Scale Character Infrastructure Traffic Privacy

Likely Support Reasons

These are potential reasons to support this application based on the proposal:

Housing Need Brownfield Density Regeneration

Detail pages

Documents

ACKNOWLEDGEMENT VALID APPLICATION
Correspondence
Not downloaded · Council link
ACKNOWLEDGEMENT VALID APPLICATION
Correspondence
Not downloaded · Council link
ACOMMODATION SCHEDULE
Report
Not downloaded · Council link
APPLICATIONFORMREDACTED
Application Form
Not downloaded · Council link
DAYLIGHT SUNLIGHT REPORT
Report
Not downloaded · Council link
ENVIRONMENTAL ASSESSMENT
Report
Not downloaded · Council link
EXISTING ELEVATIONS
Drawing
Not downloaded · Council link
EXISTING FLOOR PLANS
Drawing
Not downloaded · Council link
EXISTING SITE PLAN
Drawing
Archived copy · Council link
FIRE STATEMENT
Report
Not downloaded · Council link
FLOOD RISK ASSESSMENT
Report
Not downloaded · Council link
LOCATION PLAN
Drawing
Not downloaded · Council link
PROPOSED ELEVATIONS
Drawing
Not downloaded · Council link
PROPOSED FLOOR PLANS
Drawing
Archived copy · Council link
PROPOSED ROOM SCHEDULE
Report
Not downloaded · Council link
PROPOSED SITE PLAN
Drawing
Archived copy · Council link
SITE NOTICE (STANDARD ARTICLE 8)
Correspondence
Not downloaded · Council link
SITE NOTICE (STANDARD ARTICLE 8)
Correspondence
Not downloaded · Council link
TECHINICAL NOTE, THE AIRCRAFT FACTORY - ACOUSTICS
Report
Not downloaded · Council link
TRANSPORT STATEMENT - FINAL.
Report
Not downloaded · Council link
WASTE STRATEGY
Report
Not downloaded · Council link