← Back to Hammersmith & Fulham

Status

Pending Consideration
Received n/a
New dwellings n/a

What you can do

Take Action

Make your voice heard. Authorities need to hear from people who support new homes.

Full Proposal

Erection of an additional floor at roof level in connection with the creation of 5no. bedrooms, and erection of a three storey plus basement level including formation of new lightwells in the rear garden in connection with the creation of 12no. bedrooms to the existing large HMO (Class Sui Generis); rebuilding existing chimney stack and reinstatement of chimney pots at roof level of the main building; erection of foldable guard rails around the perimeter, installation of 2no. air source heat pumps, erection of an acoustic barrier, and installation of a roof access hatch on top of the flat roof at roof level of the main building; erection of a bike and a bin store in the rear garden; excavation of part of the rear garden to enlarge existing rear lightwell; minor external alterations and associated works including landscaping.

Detail pages

Documents

ACKNOWLEDGEMENT VALID APPLICATION
Correspondence
Not downloaded · Council link
ACKNOWLEDGEMENT VALID APPLICATION
Correspondence
Not downloaded · Council link
APPLICATIONFORMREDACTED
Application Form
Not downloaded · Council link
ARBORICULTURAL SURVEY & IMPACT ASSESSMENT
Report
Not downloaded · Council link
BIODIVERSITY NET GAIN ASSESSMENT
Report
Not downloaded · Council link
CIL FORM
Report
Not downloaded · Council link
CONSTRUCTION METHOD STATEMENT
Report
Not downloaded · Council link
CONSTRUCTION TRAFFIC MANAGEMENT PLAN
Report
Not downloaded · Council link
DAYLIGHT AND SUNLIGHT ASSESSMENT
Report
Not downloaded · Council link
DESIGN AND ACCESS STATEMENT
Report
Not downloaded · Council link
FIRE STATEMENT
Report
Not downloaded · Council link
FLOOD RISK ASSESSMENT & SUDS REPORT
Report
Not downloaded · Council link
HERITAGE STATEMENT
Report
Not downloaded · Council link
HMO OPERATIONAL MANAGEMENT PLAN
Report
Not downloaded · Council link
INVALID LETTER PLANNING APPLICATIONS
Correspondence
Not downloaded · Council link
INVALID LETTER PLANNING APPLICATIONS
Correspondence
Not downloaded · Council link
INVALID LETTER PLANNING APPLICATIONS
Correspondence
Not downloaded · Council link
NOISE IMPACT ASSESSMENT
Report
Not downloaded · Council link
PLANNING STATEMENT
Report
Not downloaded · Council link
PRELIMINARY ECOLOGICAL APPRAISAL AND ROOST ASSESSMENT
Report
Not downloaded · Council link
SITE NOTICE (STANDARD ARTICLE 8)
Correspondence
Not downloaded · Council link
SUSTAINABILITY STATEMENT
Report
Not downloaded · Council link
TRANSPORT STATEMENT
Report
Not downloaded · Council link