← Back to Greenwich

Status

Registered New housing
Received 12 Mar 2025
New dwellings 802

What you can do

Take Action

Make your voice heard. Authorities need to hear from people who support new homes.

Summary

Demolish and construct mixed-use buildings (1–30 storeys) providing 802 residential homes and commercial/community uses.

Full Proposal

Demolition of existing building and construction of buildings ranging from 1 to 30 storeys for residential (Class C3) and Class E, local community (Class F2), education (Class F1), and drinking establishment (Sui Generis) use; cycle parking and facilities, landscaping and highway improvements, servicing and plant and all other ancillary and associated works. (This application is an EIA development and is accompanied by an Environmental Statement) (This is a cross borough application with the London Borough of Lewisham, their reference: DC/25/139390) [RE-CONSULTATION] Further information not forming part of the formal description of development provided for re-consultation purposes: This application is located both within the Royal Borough of Greenwich (RBG) and London Borough of Lewisham (LBL). The scheme as a whole provides 802 C3 residential homes across both boroughs (down from 903 C3 homes originally proposed) This equates to 254 C3 residential homes in RBG (down from 306 C3 homes originally proposed) and 548 C3 homes in LBL (down from 597 C3 homes originally proposed) The schemes non-commercial floorspace has lowered from 8,713m2 GIA to 8,571m2 Non-commercial floorspace made up of 5,213m2 GIA Education (Class F1), 508m2 GIA Retail (Class E (a), 841m2 GIA Food and Beverage (Class E (b)/Sui Generis), 1579m2 GIA Workspace (Class E (c/g)) and 430m2 GIA Shared Back of House (3,358m2 non-residential floorspace within RBG and 5,213m2 non-residential floorspace within LBL) The proposed buildings height and massing have been further clarified below to include the ground floors. Building A is 30 storey, Building B is 7-11 storeys, Building C is 15 storeys and Building D is 18 storeys (These are all based in LBL). Building E is 19 storeys (reduced from 24 storeys originally submitted), Building F is 10 storeys, Building G is 10 storeys and Building H is 1 storeys (These are all based in RBG).

Detail pages

Documents

Acknowledgement letter
Correspondence
Not downloaded · Council link
Amended - addendum to the environmental statement
Document
Not downloaded · Council link
Amended - addendum to the environmental statement (appendices list)
Document
Not downloaded · Council link
Amended - addendum to the environmental statement (appendix a)
Document
Not downloaded · Council link
Amended - addendum to the environmental statement (appendix b(i)-b(xiii))
Document
Not downloaded · Council link
Amended - addendum to the environmental statement (appendix c)
Document
Not downloaded · Council link
Amended - addendum to the environmental statement (appendix d - part 1)
Document
Not downloaded · Council link
Amended - addendum to the environmental statement (appendix d - part 2)
Document
Not downloaded · Council link
Amended - addendum to the environmental statement (appendix e)
Document
Not downloaded · Council link
Amended - addendum to the environmental statement (appendix f)
Document
Not downloaded · Council link
Amended - addendum to the environmental statement (appendix g)
Document
Not downloaded · Council link
Amended - addendum to the environmental statement (appendix h)
Document
Not downloaded · Council link
Amended - addendum to the environmental statement (appendix i)
Document
Not downloaded · Council link
Amended - addendum to the environmental statement (appendix j)
Document
Not downloaded · Council link
Amended - addendum to the environmental statement (appendix k)
Document
Not downloaded · Council link
Amended - addendum to the environmental statement (appendix l)
Document
Not downloaded · Council link
Amended - addendum to the environmental statement (appendix m)
Document
Not downloaded · Council link
Amended - addendum to the environmental statement (appendix n - part 1)
Document
Not downloaded · Council link
Amended - addendum to the environmental statement (appendix n - part 2)
Document
Not downloaded · Council link
Amended - addendum to the environmental statement (appendix o)
Document
Not downloaded · Council link
Amended - addendum to the environmental statement (appendix p)
Document
Not downloaded · Council link
Amended - addendum to the environmental statement (figures list)
Document
Not downloaded · Council link
Amended - addendum to the environmental statement (figures)
Document
Not downloaded · Council link
Amended - addendum to the environmental statement (non technical statement)
Document
Not downloaded · Council link
Amended - addendum to the environmental statement (non-technical statement)
Document
Not downloaded · Council link
Amended - arboricultural report
Document
Not downloaded · Council link
Amended - circular economy assessment
Document
Not downloaded · Council link
Amended - circular economy assessment - appendix b
Document
Not downloaded · Council link
Amended - circular economy assessment - appendix c
Document
Not downloaded · Council link
Amended - circular economy assessment - appendix d
Document
Not downloaded · Council link
Amended - circular economy assessment - appendix e
Document
Not downloaded · Council link
Amended - circular economy assessment - appendix g
Document
Not downloaded · Council link
Amended - circular economy assessment - appendix h
Document
Not downloaded · Council link
Amended - combined block e, f, g and h elevations - greenwich
Drawing
Not downloaded · Council link
Amended - combined blocks a and b elevations - lewisham
Drawing
Not downloaded · Council link
Amended - combined blocks a and b plans - lewisham
Drawing
Not downloaded · Council link
Amended - combined blocks a and b sections - lewisham
Drawing
Not downloaded · Council link
Amended - combined blocks c and d elevations - lewisham
Drawing
Not downloaded · Council link
Amended - combined blocks c and d plans - lewisham
Drawing
Not downloaded · Council link
Amended - combined blocks c and d sections - lewisham
Drawing
Not downloaded · Council link
Amended - combined blocks e, f, g and h plans - greenwich
Drawing
Not downloaded · Council link
Amended - combined blocks e, f, g and h sections - lewisham
Drawing
Not downloaded · Council link
Amended - combined cemp (appendix g for circular economy statement)
Document
Not downloaded · Council link
Amended - combined delivery and servicing plan
Document
Not downloaded · Council link
Amended - combined existing block plans
Drawing
Not downloaded · Council link
Amended - combined existing elevations
Drawing
Not downloaded · Council link
Amended - combined landscaping design and access statement
Document
Not downloaded · Council link
Amended - combined landscaping plans
Drawing
Not downloaded · Council link
Amended - combined site wide elevations
Drawing
Not downloaded · Council link
Amended - combined transport assessment
Document
Not downloaded · Council link
Amended - combined travel plan
Document
Not downloaded · Council link
Amended - combined waste management strategy (appendix f from circular economy s
Document
Not downloaded · Council link
Amended - covering letter
Document
Not downloaded · Council link
Amended - design and access statement - part 1
Document
Not downloaded · Council link
Amended - design and access statement - part 2
Document
Not downloaded · Council link
Amended - drawing issue sheet
Document
Not downloaded · Council link
Amended - economic statement addendum
Document
Not downloaded · Council link
Amended - energy strategy
Document
Not downloaded · Council link
Amended - energy strategy (appendix g - brukl - be lean details)
Document
Not downloaded · Council link
Amended - energy strategy (appendix i - combined breeam details)
Document
Not downloaded · Council link
Amended - energy strategy (appendix j - pv panels)
Document
Not downloaded · Council link
Amended - energy strategy (appendix k - combined dhn correspondence)
Document
Not downloaded · Council link
Amended - energy strategy (appendix l - combined ashp schematics)
Document
Not downloaded · Council link
Amended - energy strategy (appendix m - combined future dhn location plans)
Document
Not downloaded · Council link
Amended - energy strategy (appendix n - roof layout)
Document
Not downloaded · Council link
Amended - external impact - daylight and sunlight report
Document
Not downloaded · Council link
Amended - fire statement
Document
Not downloaded · Council link
Amended - fire statement form
Document
Not downloaded · Council link
Amended - flood risk assessment - part 1
Document
Not downloaded · Council link
Amended - flood risk assessment - part 2
Document
Not downloaded · Council link
Amended - gla carbon emission reporting spreadsheet - block a
Document
Not downloaded · Council link
Amended - gla carbon emission reporting spreadsheet - block b
Document
Not downloaded · Council link
Amended - gla carbon emission reporting spreadsheet - blocks c and d
Document
Not downloaded · Council link
Amended - gla carbon emission reporting spreadsheet - blocks e and g
Document
Not downloaded · Council link
Amended - gla carbon emission reporting spreadsheet - blocks f
Document
Not downloaded · Council link
Amended - gla carbon emission reporting spreadsheet - greenwich
Document
Not downloaded · Council link
Amended - gla carbon emission reporting spreadsheet - lewisham
Document
Not downloaded · Council link
Amended - gla carbon emission reporting spreadsheet - site wide
Document
Not downloaded · Council link
Amended - health impact assessment addendum
Document
Not downloaded · Council link
Amended - heritage statement addendum
Document
Not downloaded · Council link
Amended - internal impact - daylight and sunlight report
Document
Not downloaded · Council link
Amended - phase 1 desk study report - part 1
Document
Not downloaded · Council link
Amended - phase 1 desk study report - part 2
Document
Not downloaded · Council link
Amended - planning statement
Document
Not downloaded · Council link
Amended - proposed block plan
Drawing
Not downloaded · Council link
Amended - retail impact assessment
Document
Not downloaded · Council link
Amended - site wide ground floor block plan
Drawing
Not downloaded · Council link
Amended - site wide roof plan
Drawing
Not downloaded · Council link
Amended - site wide sections
Drawing
Not downloaded · Council link
Amended - utilities statement
Document
Not downloaded · Council link
Amended - ventilation statement
Document
Not downloaded · Council link
Amended - viability report
Document
Not downloaded · Council link
Amended - whole life cycle assessment
Document
Not downloaded · Council link
Amended -biodiversity net gain metric spreadsheet
Document
Not downloaded · Council link
Amended -biodiversity net gain metric spreadsheet
Document
Not downloaded · Council link
Applicants response to glaas
Document
Not downloaded · Council link
Application form
Application Form
Not downloaded · Council link
Arboticultural impact assessment
Superseded
Not downloaded · Council link
Archeology desk based assessment - june 2025
Document
Not downloaded · Council link
Bng - combined plans
Drawing
Not downloaded · Council link
Bng metric spreadsheet
Superseded
Not downloaded · Council link
Circular economy gla spreadsheet
Superseded
Not downloaded · Council link
Circular economy statement
Superseded
Not downloaded · Council link
Combined landscaping plan and details
Superseded
Not downloaded · Council link
Combined site wide elevations
Superseded
Not downloaded · Council link
Combined site wide proposed plans
Superseded
Archived copy · Council link
Correspondence between consultant and glaas
Correspondence
Not downloaded · Council link
Cover letter
Superseded
Not downloaded · Council link
Daylight and sunlight report
Superseded
Not downloaded · Council link
Delivery and servicing plan
Superseded
Not downloaded · Council link
Design and access statement (lr version)
Superseded
Not downloaded · Council link
Designing out crime statement
Document
Not downloaded · Council link
Economic statement
Document
Not downloaded · Council link
Energy and sustainability strategy
Superseded
Not downloaded · Council link
Environmental statement - non technical summary
Document
Not downloaded · Council link
Environmental statement - volume 1
Document
Not downloaded · Council link
Environmental statement - volume 2 - townscape visual impact assessment combined
Document
Not downloaded · Council link
Environmental statement - volume 3 - part 1
Document
Not downloaded · Council link
Environmental statement - volume 3 - part 2
Document
Not downloaded · Council link
Environmental statement - volume 3 - part 3
Document
Not downloaded · Council link
Environmental statement - volume 3 - part 4
Document
Not downloaded · Council link
Environmental statement - volume 3 - part 5
Document
Not downloaded · Council link
Es volume 3 - appendix 12.2
Document
Not downloaded · Council link
Existing elevations and plans including demolition plan
Superseded
Not downloaded · Council link
Financial viability report
Document
Not downloaded · Council link
Fire statement
Superseded
Not downloaded · Council link
Fire statement form
Superseded
Not downloaded · Council link
Flood risk assessment and drainage strategy - part 1
Superseded
Not downloaded · Council link
Flood risk assessment and drainage strategy - part 2
Superseded
Not downloaded · Council link
Greenwich side - buildings e,f,g and h proposed elevations
Superseded
Not downloaded · Council link
Greenwich side - buildings e,f,g and h proposed sections
Superseded
Not downloaded · Council link
Health impact assessment
Document
Not downloaded · Council link
Heritage statement
Document
Not downloaded · Council link
Internal daylight, sunlight & overshadowing assessment
Superseded
Not downloaded · Council link
Landscaping design and access statement, public realm and landscape
Superseded
Not downloaded · Council link
Lewisham side - buildings a and b proposed elevations
Superseded
Not downloaded · Council link
Lewisham side - buildings a and b proposed sections
Superseded
Not downloaded · Council link
Lewisham side - buildings c and d proposed elevations
Superseded
Not downloaded · Council link
Lewisham sides - building c and d proposed sections
Superseded
Not downloaded · Council link
Operational waste management strategy
Superseded
Not downloaded · Council link
Outline construction environmental management plan
Superseded
Not downloaded · Council link
Phase 1 - contaminated land report
Document
Not downloaded · Council link
Planning statement
Superseded
Not downloaded · Council link
Proposed site wide block plan
Superseded
Not downloaded · Council link
Proposed site wide sections
Superseded
Not downloaded · Council link
Retail impact assessment
Superseded
Not downloaded · Council link
River impact study
Document
Not downloaded · Council link
Statement of community involvement
Document
Not downloaded · Council link
Tall building statement
Document
Not downloaded · Council link
Transport assessment
Superseded
Not downloaded · Council link
Travel plan
Superseded
Not downloaded · Council link
Utilities statement
Superseded
Not downloaded · Council link
Ventilation statement
Superseded
Not downloaded · Council link
Whole life carbon assessment
Superseded
Not downloaded · Council link
Whole life carbon gla spreadsheet
Document
Not downloaded · Council link