Application
25/3325/F
Greenwich · IDOX
Status
Awaiting decision
New utilities
Received
06 Oct 2025
New dwellings
0
What you can do
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.
Summary
Construction of an electrical substation.
Full Proposal
Construction of electrical substation.
Detail pages
- View live detail on council site
- No archived detail page available.
Documents
Application form redacted
Application Form
Not downloaded
· Council link
Archived copy
· Council link
Correspondance
Correspondence
Not downloaded
· Council link
Design and access statement
Document
Not downloaded
· Council link
Drawings pack
Drawing
Not downloaded
· Council link
Existing elevation and plan
Drawing
Not downloaded
· Council link
Existing site plan
Drawing
Archived copy
· Council link
Existing site plan 2
Drawing
Archived copy
· Council link
Proposed elevation and plan
Drawing
Not downloaded
· Council link
Proposed site plan
Drawing
Archived copy
· Council link
Proposed site plan 2
Drawing
Archived copy
· Council link
Revised drawings (annotations and notes)
Revised Drawing
Not downloaded
· Council link
Site location plan
Drawing
Archived copy
· Council link
Site plan
Drawing
Archived copy
· Council link