← Back to Fylde Borough Council

Status

Awaiting Assessment
Received 01 Dec 2025
New dwellings n/a

What you can do

Take Action

Make your voice heard. Authorities need to hear from people who support new homes.

Full Proposal

REDEVELOPMENT OF RETAIL UNIT INCLUDING: 1) INSTALLATION OF NEW PLANT EQUIPMENT IN REAR YARD INCLUDING ERECTION OF 2.4 METRE HIGH FENCED ENCLOSURE; 2) BLOCKING UP OF ROLLER SHUTTER DOOR AND LOUVRES WITH SOLID WALLS AND INSERTION OF GROUND FLOOR DOORWAY ON NORTH FACING SIDE ELEVATION; 3) INSTALLATION OF REPLACEMENT SLIDING DOORS TO NORTH SIDE OF ENTRANCE PORCH; 4) INSTALLATION OF EXTERNAL LIGHTING TO REAR OF BUILDING; AND 5) INSTALLATION OF PARCEL LOCKERS AND BOLLARDS TO FRONT OF BUILDING

Detail pages

Documents

(1006kb)
Document
Archived copy · Council link
(149kb)
Document
Not downloaded · Council link
(149kb)
Document
Not downloaded · Council link
(1713kb)
Document
Not downloaded · Council link
(1730kb)
Document
Not downloaded · Council link
(324kb)
Document
Not downloaded · Council link
(3405kb)
Document
Not downloaded · Council link
(3666kb)
Document
Not downloaded · Council link
(400kb)
Document
Not downloaded · Council link
(407kb)
Document
Not downloaded · Council link
(464kb)
Document
Archived copy · Council link
(792kb)
Document
Not downloaded · Council link