← Back to Enfield
Status
Application in Progress
Received
Last month
New dwellings
n/a
What you can do
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.
Full Proposal
Hybrid planning application (part detailed/part outline) for the demolition of all existing buildings and structures, site preparation works and the phased comprehensive redevelopment of part of Southbury Leisure Park comprising: Detailed Planning Application for the demolition of all buildings/structures and the removal of all existing car parking spaces across the entire application site, the re-provision of car parking spaces (for third party use), and the phased construction of two development plots delivering residential (Class C3) and flexible commercial / community uses (Classes E, F.1, and/or F.2), alongside all associated parking, plant, infrastructure, access, and hard and soft landscaping (which will deliver public realm, a new linear park, circulation routes, amenity areas, ecological enhancements and play space). Outline Planning Application (with some matters reserved- appearance, landscaping, layout, scale) for the phased construction of two development plots delivering residential (Class C3) and flexible commercial / community uses (Classes E, F.1, and/or F.2), alongside all associated parking, plant, infrastructure, access, and hard and soft landscaping (which will deliver public realm, circulation routes, amenity areas, ecological enhancements and play space). (An Environmental Statement, including a non-technical summary, also accompanies the planning application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended)).
Documents
ACCOMMODATION SCHEDULE FOR THE DETAILED PART (BLOCKS A & B),
Supporting Information
ACCOMMODATION SCHEDULE PLOTS C AND D OUTLINE PART
Supporting Information
APPENDIX 10.1- LEGISLATION AND POLICY.F
Environmental Statement
APPENDIX 10.2- BASELINE SURVEY DATA.F
Environmental Statement
APPENDIX 10.3- PROPG ASSESSMENT AND RESIDENTIAL ACOUSTIC DESIGN STATEMENT.F
Environmental Statement
APPENDIX 11.1-WIND MICROCLIMATE ASSESSMENT METHODOLOGY.F
Environmental Statement
APPENDIX 12.1- ASSESSMENT SCENARIO DRAWINGS AND PROPERTY LOCATIONS.F
Environmental Statement
APPENDIX 12.2- DAYLIGHT AND SUNLIGHT TECHNICAL RESULTS.F
Environmental Statement
APPENDIX 12.3- OVERSHADOWING DRAWINGS SUN HOURS.F
Environmental Statement
APPENDIX 12.4- TRANSIENT OVERSHADOWING DRAWINGS.F_PART 1
Environmental Statement
APPENDIX 12.4- TRANSIENT OVERSHADOWING DRAWINGS.F_PART 2
Environmental Statement
APPENDIX 12.4- TRANSIENT OVERSHADOWING DRAWINGS.F_PART 3
Environmental Statement
APPENDIX 12.4- TRANSIENT OVERSHADOWING DRAWINGS.F_PART 4
Environmental Statement
APPENDIX 12.4- TRANSIENT OVERSHADOWING DRAWINGS.F_PART 5
Environmental Statement
APPENDIX 12.4- TRANSIENT OVERSHADOWING DRAWINGS.F_PART 6
Environmental Statement
APPENDIX 12.5- DAYLIGHT AND SUNLIGHT SUMMARY TABLES.F
Environmental Statement
APPENDIX 3.1-LOCATION OF INFORMATION SPECIFIED WITHIN THE ES.F
Environmental Statement
APPENDIX 3.2-EIA SCOPING REPORT.F_PART 1
Environmental Statement
APPENDIX 3.2-EIA SCOPING REPORT.F_PART 2
Environmental Statement
APPENDIX 3.3-LB ENFIELD EIA SCOPING DECISION.F
Environmental Statement
APPENDIX 3.4- SOUTHBURY LEISURE PARK SCOPING OPINION REVIEW (PELL FRISCHMANN).F
Environmental Statement
APPENDIX 3.5- LIST OF CUMULATIVE SCHEMES.F
Environmental Statement
APPENDIX 5.1- SELECTION OF PLANNING DRAWINGS.F
Environmental Statement
APPENDIX 5.2- PARAMETER PLANS.F
Environmental Statement
APPENDIX 5.3- DESIGN CODE.F_PART 1
Environmental Statement
APPENDIX 5.3- DESIGN CODE.F_PART 2
Environmental Statement
APPENDIX 5.3- DESIGN CODE.F_PART 3
Environmental Statement
Appendix 6.1 OUTLINE CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN
Environmental Statement
APPENDIX 8.1- LEGISLATION POLICY GUIDANCE.F
Environmental Statement
APPENDIX 8.2- TRANSPORT ASSESSMENT.F_PART 1
Environmental Statement
APPENDIX 8.2- TRANSPORT ASSESSMENT.F_PART 2
Environmental Statement
APPENDIX 8.2- TRANSPORT ASSESSMENT.F_PART 3
Environmental Statement
APPENDIX 8.3- FRAMEWORK TRAVEL PLAN (RESIDENTIAL AND WORKPLACE).F
Environmental Statement
APPENDIX 8.4- OUTLINE CONSTRUCTION LOGISTICS PLAN.F
Environmental Statement
APPENDIX 9.1- AIR QUALITY TECHNICAL APPENDICES.F
Environmental Statement
APPENDIX 9.2- AIR QUALITY POSITIVE STATEMENT.F
Environmental Statement
APPENDIX A- BRUKL
Energy Statement
APPENDIX A- SAPS
Energy Statement
APPENDIX B PV LAYOUT
Energy Statement
Appendix D Part_l_2021_gla_carbon_emission_reporting_spreadsheet Detailed A and
Energy Statement
Appendix D Part_l_2021_gla_carbon_emission_reporting_spreadsheet Outline C and D
Energy Statement
Appendix F - Be Seen Spreadsheet - A& B
Energy Statement
Appendix F - Be Seen Spreadsheet - C & D
Energy Statement
Application Form - Without Personal Data
Application Form - Without Personal Data
ARBORICULTURAL IMPACT ASSESSMENT
Tree Survey
ARBORICULTURAL METHOD STATEMENT
Tree Survey
ARCHAEOLOGICAL DESK-BASED ASSESSMENT
Archaeological Assessment
ARCHAEOLOGY UPDATE- CORRESPONDENCE WITH GLAAS
Archaeological Assessment
BIODIVERSITY DECLARATION FORM
Biodiversity Statement
CHAPTER 10: NOISE AND VIBRATION
Environmental Statement
CHAPTER 11: WIND MICROCLIMATE
Environmental Statement
CHAPTER 12: DAYLIGHT SUNLIGHT AND OVERSHADOWING
Environmental Statement
CHAPTER 13: CLIMATE CHANGE AND GREENHOUSE GASES
Environmental Statement
CHAPTER 14: EFFECT INTERACTIONS
Environmental Statement
CHAPTER 15: SUMMARY OF LIKELY SIGNIFICANT EFFECTS
Environmental Statement
CHAPTER 1: INTRODUCTION
Environmental Statement
CHAPTER 2: SITE AND SETTING
Environmental Statement
CHAPTER 3: EIA METHODOLOGY
Environmental Statement
CHAPTER 4: ALTERNATIVES
Environmental Statement
CHAPTER 5: DESCRIPTION OF THE DEVELOPMENT
Environmental Statement
CHAPTER 6: DEMOLITION AND CONSTRUCTION
Environmental Statement
CHAPTER 7: SOCIO-ECONOMICS
Environmental Statement
CHAPTER 8: TRANSPORT AND ACCESS
Environmental Statement
CHAPTER 9: AIR QUALITY
Environmental Statement
CIL FORM 1
Community Infrastructure Levy ? Completed Form
CIRCULAR ECONOMY GLA Detailed part - 101225
Supporting Information
CIRCULAR ECONOMY GLA Outline part - 101225
Supporting Information
CIRCULAR ECONOMY STATEMENT PART 1 OF 2
Supporting Information
CIRCULAR ECONOMY STATEMENT PART 2 OF 2
Supporting Information
CONSTRUCTION LOGISTICS PLAN
Supporting Information
COVERING LETTER
Covering Letter
DELIVERY AND SERVICING MANAGEMENT PLAN
Supporting Information
DESIGN AND ACCESS STATEMENT PHOTOGRAPHS AND PHOTOMONTAGES
Photo
DESIGN AND ACCESS STATEMENT PHOTOGRAPHS AND PHOTOMONTAGES
Photo
DESIGN AND ACCESS STATEMENT PHOTOGRAPHS AND PHOTOMONTAGES
Photo
DESIGN AND ACCESS STATEMENT PHOTOGRAPHS AND PHOTOMONTAGES
Photo
DESIGN AND ACCESS STATEMENT PHOTOGRAPHS AND PHOTOMONTAGES
Photo
DESIGN AND ACCESS STATEMENT PHOTOGRAPHS AND PHOTOMONTAGES
Photo
DESIGN CODE PART 1 OF 2
Supporting Information
DESIGN CODE PART 2 OF 2
Supporting Information
DETAIL PART LANDSCAPE GENERAL ARRANGEMENT
Landscaping Details
DETAIL PART LANDSCAPE TERRACE PLAN
Landscaping Details
DEVELOPMENT SPECIFICATION
Supporting Information
DRAFT BIODIVERSITY GAIN PLAN
Biodiversity Gain Plan
ECONOMIC BENEFITS STATEMENT
Economic Statement
ENERGY STATEMENT
Energy Statement
EPPING FOREST SAC AGREEMENT FORM
Supporting Information
EXISTING SITE ELEVATIONS E01-E04
Drawing
EXISTING SITE ELEVATIONS E05-E12
Drawing
EXISTING SITE SECTIONS A, B AND C
Drawing
EXISTING SITE SECTIONS D, E, AND F
Drawing
Financial Viability Assessment
Supporting Information
FIRE STATEMENT
Fire Statement
FLOOD RISK ASSESSMENT AND SUDS DRAINAGE STRATEGY PART 1
Flood Risk Assessment
FLOOD RISK ASSESSMENT AND SUDS DRAINAGE STRATEGY PART 2
Flood Risk Assessment
FLOOD RISK ASSESSMENT AND SUDS DRAINAGE STRATEGY PART 3
Flood Risk Assessment
FLOOD RISK ASSESSMENT AND SUDS DRAINAGE STRATEGY PART 4
Flood Risk Assessment
FLOOD RISK ASSESSMENT AND SUDS DRAINAGE STRATEGY PART 5
Flood Risk Assessment
FLOOD RISK ASSESSMENT AND SUDS DRAINAGE STRATEGY PART 6
Flood Risk Assessment
GOOD HOMES ALLIANCE- OVERHEATING IN NEW HOMES TOOLS
Sustainability Appraisal
HEALTH AND EQUALITIES IMPACT ASSESSMENT
Supporting Information
HEALTH TOWNSCAPE & VISUAL IMPACT ASSESSMENT LR_PART 1
Environmental Statement
HEALTH TOWNSCAPE & VISUAL IMPACT ASSESSMENT LR_PART 2
Environmental Statement
HEALTH TOWNSCAPE & VISUAL IMPACT ASSESSMENT LR_PART 3
Environmental Statement
HEALTH TOWNSCAPE & VISUAL IMPACT ASSESSMENT LR_PART 4
Environmental Statement
HEALTH TOWNSCAPE & VISUAL IMPACT ASSESSMENT LR_PART 5
Environmental Statement
HEALTH TOWNSCAPE & VISUAL IMPACT ASSESSMENT LR_PART 6
Environmental Statement
HIGHWAYS SAFETY IMPACT PROFORMA
Supporting Information
HOUSING NEEDS STATEMENT
Supporting Information
INTERNAL DAYLIGHT AND SUNLIGHT REPORT PART 1
Daylight/Sunlight Assessment
INTERNAL DAYLIGHT AND SUNLIGHT REPORT PART 2
Daylight/Sunlight Assessment
INTERNAL DAYLIGHT AND SUNLIGHT REPORT PART 3
Daylight/Sunlight Assessment
LANDSCAPE GENERAL ARRANGEMENT
Landscaping Details
LANDSCAPE TERRACE PLANS
Landscaping Details
NON-TECHNICAL SUMMARY
Environmental Statement
NOTICE UNDER ARTICLE 13 ADVERISED 31-12-2025
Press Notice
OPERATIONAL WASTE MANAGEMENT PLAN
Supporting Information
OUTLINE FIRE SAFETY STRATEGY
Fire Strategy
PART 1
Utilities Statement
PART 1 OF 14
Design & Access Statement
PART 10
Utilities Statement
PART 10 OF 14
Design & Access Statement
PART 11
Utilities Statement
PART 12
Utilities Statement
PART 12 OF 14
Design & Access Statement
PART 13
Utilities Statement
PART 13 OF 14
Design & Access Statement
PART 14
Utilities Statement
PART 14 OF 14
Design & Access Statement
PART 15
Utilities Statement
PART 2
Utilities Statement
PART 2 OF 14
Design & Access Statement
PART 3
Utilities Statement
PART 3 OF 14
Design & Access Statement
PART 4
Utilities Statement
PART 4 OF 14
Design & Access Statement
PART 5
Utilities Statement
PART 5 OF 14
Design & Access Statement
PART 6
Utilities Statement
PART 6 OF 14
Design & Access Statement
PART 7
Utilities Statement
PART 7 OF 14
Design & Access Statement
PART 8
Utilities Statement
PART 8 OF 14
Design & Access Statement
PART 9
Utilities Statement
PART 9 OF 14
Design & Access Statement
PART11 OF 14
Design & Access Statement
PHASE 1 DESK STUDY_PART 1
Land Contamination Assessment
PHASE 1 DESK STUDY_PART 2
Land Contamination Assessment
PHASE 1 DESK STUDY_PART 3
Land Contamination Assessment
PHASE 1 DESK STUDY_PART 4
Land Contamination Assessment
PHASE 1 DESK STUDY_PART 5
Land Contamination Assessment
PHASE 1 DESK STUDY_PART 6
Land Contamination Assessment
PHASE 1 DESK STUDY_PART 7
Land Contamination Assessment
PHASE 1 DESK STUDY_PART 8
Land Contamination Assessment
PHASE 1 DESK STUDY_PART 9
Land Contamination Assessment
PLANNING APPLICATION FORM CLARIFICATIONS
Supporting Information
Planning statement
Planning Statement
PLOT A (DETAILED PART) GENERAL ARRANGEMENT 10TH TO 13TH FLOOR PLANS
Drawing
PLOT A (DETAILED PART) GENERAL ARRANGEMENT 14TH FLOOR PLAN
Drawing
PLOT A (DETAILED PART) GENERAL ARRANGEMENT 15TH FLOOR PLAN
Drawing
PLOT A (DETAILED PART) GENERAL ARRANGEMENT 16TH FLOOR PLAN
Drawing
PLOT A (DETAILED PART) GENERAL ARRANGEMENT 1ST FLOOR PLAN
Drawing
PLOT A (DETAILED PART) GENERAL ARRANGEMENT 2ND FLOOR PLAN
Drawing
PLOT A (DETAILED PART) GENERAL ARRANGEMENT 3RD FLOOR PLAN
Drawing
PLOT A (DETAILED PART) GENERAL ARRANGEMENT 4TH FLOOR PLAN
Drawing
PLOT A (DETAILED PART) GENERAL ARRANGEMENT 5TH FLOOR PLAN
Drawing
PLOT A (DETAILED PART) GENERAL ARRANGEMENT 6TH FLOOR PLAN
Drawing
PLOT A (DETAILED PART) GENERAL ARRANGEMENT 7TH FLOOR PLAN
Drawing
PLOT A (DETAILED PART) GENERAL ARRANGEMENT 8TH FLOOR PLAN
Drawing
PLOT A (DETAILED PART) GENERAL ARRANGEMENT 9TH FLOOR PLAN
Drawing
PLOT A (DETAILED PART) GENERAL ARRANGEMENT EAST ELEVATION
Drawing
PLOT A (DETAILED PART) GENERAL ARRANGEMENT GROUND FLOOR PLAN
Drawing
PLOT A (DETAILED PART) GENERAL ARRANGEMENT NORTH ELEVATION
Drawing
PLOT A (DETAILED PART) GENERAL ARRANGEMENT ROOF PLAN
Drawing
PLOT A (DETAILED PART) GENERAL ARRANGEMENT SOUTH ELEVATION
Drawing
PLOT A (DETAILED PART) GENERAL ARRANGEMENT WEST ELEVATION
Drawing
PLOT A (DETAILED PART) GENERAL ARRANGEMENTS COURTYARD ELEVATIONS
Drawing
PLOT B (DETAILED PART) GENERAL ARRANGEMENT 10TH FLOOR PLAN
Drawing
PLOT B (DETAILED PART) GENERAL ARRANGEMENT 11TH TO 15TH FLOOR PLANS
Drawing
PLOT B (DETAILED PART) GENERAL ARRANGEMENT 16TH FLOOR PLAN
Drawing
PLOT B (DETAILED PART) GENERAL ARRANGEMENT 17TH FLOOR PLAN
Drawing
PLOT B (DETAILED PART) GENERAL ARRANGEMENT 18TH FLOOR PLAN
Drawing
PLOT B (DETAILED PART) GENERAL ARRANGEMENT 1ST FLOOR PLAN
Drawing
PLOT B (DETAILED PART) GENERAL ARRANGEMENT 2ND FLOOR PLAN
Drawing
PLOT B (DETAILED PART) GENERAL ARRANGEMENT 3RD FLOOR PLAN
Drawing
PLOT B (DETAILED PART) GENERAL ARRANGEMENT 4TH FLOOR PLAN
Drawing
PLOT B (DETAILED PART) GENERAL ARRANGEMENT 5TH FLOOR PLAN
Drawing
PLOT B (DETAILED PART) GENERAL ARRANGEMENT 6TH - 7TH FLOOR PLAN
Drawing
PLOT B (DETAILED PART) GENERAL ARRANGEMENT 8TH FLOOR PLAN
Drawing
PLOT B (DETAILED PART) GENERAL ARRANGEMENT 9TH FLOOR PLAN
Drawing
PLOT B (DETAILED PART) GENERAL ARRANGEMENT COURTYARD ELEVATIONS
Drawing
PLOT B (DETAILED PART) GENERAL ARRANGEMENT EAST ELEVATION
Drawing
PLOT B (DETAILED PART) GENERAL ARRANGEMENT GROUND FLOOR PLAN
Drawing
PLOT B (DETAILED PART) GENERAL ARRANGEMENT NORTH ELEVATION
Drawing
PLOT B (DETAILED PART) GENERAL ARRANGEMENT ROOF PLAN
Drawing
PLOT B (DETAILED PART) GENERAL ARRANGEMENT SOUTH ELEVATION
Drawing
PLOT B (DETAILED PART) GENERAL ARRANGEMENT WEST ELEVATION
Drawing
PLOTS A & B (DETAILED PART) DETAILED FAÇADE STUDY DISTRICT HEATING SUBSTATION
Drawing
PLOTS A & B (DETAILED PART) DETAILED FAÇADE STUDY GROUND FLOOR AMENITY
Drawing
PLOTS A & B (DETAILED PART) DETAILED FAÇADE STUDY GROUND FLOOR COMMERCIAL
Drawing
PLOTS A & B (DETAILED PART) DETAILED FAÇADE STUDY GROUND FLOOR RESIDENTIAL
Drawing
PLOTS A & B (DETAILED PART) DETAILED FAÇADE STUDY LINEAR BLOCK
Drawing
PLOTS A & B (DETAILED PART) DETAILED FAÇADE STUDY TOWER BLOCK CROWN
Drawing
PLOTS A & B (DETAILED PART) DETAILED FAÇADE STUDY VILLA BLOCK UPPER FLOOR
Drawing
PLOTS A & B (DETAILED PART) GENERAL ARRANGEMENT 10TH FLOOR PLAN
Drawing
PLOTS A & B (DETAILED PART) GENERAL ARRANGEMENT 11TH TO 13TH FLOOR PLANS
Drawing
PLOTS A & B (DETAILED PART) GENERAL ARRANGEMENT 14TH FLOOR PLAN
Drawing
PLOTS A & B (DETAILED PART) GENERAL ARRANGEMENT 15TH FLOOR PLAN
Drawing
PLOTS A & B (DETAILED PART) GENERAL ARRANGEMENT 16TH FLOOR PLAN
Drawing
PLOTS A & B (DETAILED PART) GENERAL ARRANGEMENT 17TH FLOOR PLAN
Drawing
PLOTS A & B (DETAILED PART) GENERAL ARRANGEMENT 18TH FLOOR PLAN
Drawing
PLOTS A & B (DETAILED PART) GENERAL ARRANGEMENT 1ST FLOOR PLAN
Drawing
PLOTS A & B (DETAILED PART) GENERAL ARRANGEMENT 2ND FLOOR PLAN
Drawing
PLOTS A & B (DETAILED PART) GENERAL ARRANGEMENT 3RD FLOOR PLAN
Drawing
PLOTS A & B (DETAILED PART) GENERAL ARRANGEMENT 4TH FLOOR PLAN
Drawing
PLOTS A & B (DETAILED PART) GENERAL ARRANGEMENT 5TH FLOOR PLAN
Drawing
PLOTS A & B (DETAILED PART) GENERAL ARRANGEMENT 6TH FLOOR PLAN
Drawing
PLOTS A & B (DETAILED PART) GENERAL ARRANGEMENT 7TH FLOOR PLAN
Drawing
PLOTS A & B (DETAILED PART) GENERAL ARRANGEMENT 8TH FLOOR PLAN
Drawing
PLOTS A & B (DETAILED PART) GENERAL ARRANGEMENT 9TH FLOOR PLAN
Drawing
PLOTS A & B (DETAILED PART) GENERAL ARRANGEMENT GROUND FLOOR PLAN
Drawing
PLOTS A & B (DETAILED PART) GENERAL ARRANGEMENT ROOF PLAN
Drawing
PLOTS A & B (DETAILED PART) GENERAL ARRANGEMENT SITE ELEVATIONS EAST AND WEST
Drawing
PLOTS A & B (DETAILED PART) GENERAL ARRANGEMENT SITE ELEVATIONS NORTH AND SOUTH
Drawing
PLOTS A & B (DETAILED PART) GENERAL ARRANGEMENT SITE SECTIONS A & B
Drawing
PLOTS A & B (DETAILED PART) GENERAL ARRANGEMENT SITE SECTIONS C, D, E & F
Drawing
PLOTS A,B,C & D (DETAILED & OUTLINE PART) ? SITE WIDE PLAN ? 10TH FLOOR PLAN
Drawing
PLOTS A,B,C & D (DETAILED & OUTLINE PART) ? SITE WIDE PLAN ? 1ST FLOOR PLAN
Drawing
PLOTS A,B,C & D (DETAILED & OUTLINE PART) ? SITE WIDE PLAN ? 20TH FLOOR PLAN
Drawing
PLOTS A,B,C & D (DETAILED & OUTLINE PART) ? SITE WIDE PLAN ? 23RD FLOOR PLAN
Drawing
PLOTS A,B,C & D (DETAILED & OUTLINE PART) ? SITE WIDE PLAN ? 2ND FLOOR PLAN
Drawing
PLOTS A,B,C & D (DETAILED & OUTLINE PART) ? SITE WIDE PLAN ? 9TH FLOOR PLAN
Drawing
PLOTS A,B,C & D (DETAILED & OUTLINE PART) ? SITE WIDE PLAN ? GROUND FLOOR PLAN
Block Plan
Plots A,B,C & D (Detailed & Outline Part) ? Site Wide Plan ? Roof Plan
Drawing
PLOTS C & D PARAMETER PLANS ? 001 DETAILED AND OUTLINE PARTS
Drawing
PLOTS C & D PARAMETER PLANS ? 002 LAND USE
Drawing
PLOTS C & D PARAMETER PLANS ? 003 MAXIMUM BUILDING LINES
Drawing
PLOTS C & D PARAMETER PLANS ? 004 MAXIMUM BUILDING HEIGHTS AND SITE LEVELS
Drawing
PLOTS C & D PARAMETER PLANS ? 005 PUBLIC REALM/COMMUNAL AMENITY AND ACCESS/CIRCU
Drawing
PRELIMINARY ECOLOGICAL APPRAISAL
Biodiversity Survey & Report
RESIDENT TRAVEL PLAN
Travel Plan
RETAIL AND LEISURE REPORT
Supporting Information
SHADOW HABITAT REGULATIONS ASSESSMENT
Supporting Information
SITEWIDE DEMOLITION AND TREE REMOVAL/RETENTION
Drawing
Statement of community involvement
Statement of Community Involvement
SUSTAINABILITY AND BREEAM STATEMENT PART 1 OF 2
Sustainability Appraisal
SUSTAINABILITY AND BREEAM STATEMENT PART 2 OF 2
Sustainability Appraisal
THE LOCATION PLAN
OS Extract
The_Statutory_Metric_Southbury Leisure Park_V2.0_05.11.25
Biodiversity Metric Calculation Tool
TM54 REPORT: EVALUATING OPERATIONAL ENERGY PERFORMANCE OF BUILDING AT THE DESIGN
Sustainability Appraisal
TRANSPORT ASSESSMENT PART 1 OF 2
Transport Assessment
TRANSPORT ASSESSMENT PART 2 OF 2
Transport Assessment
TREE PROTECTION PLAN CONSTRUCTION PHASE
Supporting Information
TREE PROTECTION PLAN DEMOLITION PHASE
Supporting Information
URBAN GREEN FACTOR
Drawing
WASTE WATER RECYCLING TECHNICAL NOTE
Supporting Information
Whole Life Carbon Assessment GLA Outline part - 101225
Supporting Information
WHOLE LIFE- CYCLE CARBON ASSESSMENT GLA DETAILED PART - 101225
Supporting Information
WHOLE LIFE-CYCLE CARBON ASSESSMENT
Supporting Information
WORKPLACE TRAVEL PLAN
Travel Plan