← Back to Doncaster Metropolitan Borough Council
Status
Awaiting decision
New housing
Received
21 Jan 2025
New dwellings
0
What you can do
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.
Summary
Outline multi-tenure residential-led development (C2/C3) with school land, community buildings, and open space.
Full Proposal
Outline planning application (with all matters reserved except external vehicular highway access) for multi-tenure residential development (Use Class C2/C3) (including affordable housing, later living, retirement accommodation, assisted living, build to rent and other complimentary/multi-tenure/specialist housing) with land identified for a single form entry primary school (if required), including the demolition of Warren House Farm and the provision of community buildings (Use Classes E, F1 (a-g), F2 (a-d), sui generis uses comprising drinking establishments with expanded food provision, co-working hubs (Use Classes E, F1 (a-g), F2 (a-d)), drainage works (including SUDs), public open space with children's play space, enhancements to existing footpaths/tracks, new footpaths and cycle ways (including the creation of an active travel corridor)
Documents
2017 Baseline Noise Survey
Noise Assessment
2018 Baseline Noise Survey
Noise Assessment
20251107 Planning-Gateway East Summary Education Note FINAL
Additional Plans/Information
24 5716 18J - ILLUSTRATIVE MASTERPLAN APP2 - 04.07.25 COLOURED
Additional Plans/Information
24 5716 19J - PARAMETER PLAN - LAND USE AND GREEN INFRASTUCTURE
Additional Plans/Information
24 5716 20i - PARAMETER PLAN - BUILDING HEIGHTS
Additional Plans/Information
24 5716 28H - PARAMETER PLAN - ACTIVE TRAVEL
Additional Plans/Information
25.11.05 Response to Members Questions Final (05.11.25)
Additional Plans/Information
Active Travel England
Consultation Reply
Active Travel England
Consultation Reply
Active Travel England
Consultation Reply
Active Travel England
Consultation Reply
Agricultural Land Quality
Additional Plans/Information
Air Quality
Consultation Reply
Air Quality Assessment
Air Quality Assessment
Air Quality Assessment
Air Quality Assessment
Appendix 7.3 Trial Trenching Evaluation Report
Environmental Statement
Appendix 8.10 Arboriculture Impact Assessment
Tree Survey
Appendix 8.10 Arboriculture Impact Assessment
Tree Survey
Appendix 8.10 Arboriculture Impact Assessment - Part 1
Tree Survey
Appendix 8.10 Arboriculture Impact Assessment - Part 2
Tree Survey
Appendix 8.10 Arboriculture Impact Assessment - Part 3
Tree Survey
Appendix 8.10 Arboriculture Impact Assessment - Part 4
Tree Survey
Appendix 8.10 Arboriculture Impact Assessment Part 1
Tree Survey
Appendix 8.10 Arboriculture Impact Assessment Part 2
Tree Survey
Appendix 8.10 Arboriculture Impact Assessment Part 3
Tree Survey
Appendix 8.10 Arboriculture Impact Assessment Part 4
Tree Survey
Appendix 8.10A Arboriculture Impact Assessment_Part1
Environmental Statement
Appendix 8.10A Arboriculture Impact Assessment_Part2
Environmental Statement
Appendix 8.10A Arboriculture Impact Assessment_Part3
Environmental Statement
Appendix 8.10A Arboriculture Impact Assessment_Part4
Environmental Statement
Appendix 8.10A Arboriculture Impact Assessment_Part5
Environmental Statement
Appendix 8.10A Arboriculture Impact Assessment_Part6
Environmental Statement
Appendix 8.12 Bat Hibernation Survey Report
Environmental Statement
Appendix 8.13 Additional Bat Survey Report
Environmental Statement
Appendix 8.9A part 1 BNG Report
Environmental Statement
Application Form (No Personal Data)
Application Form (No Personal Data)
Application Form (Personal Data)
Application Form (Personal Data)
Arboricultural Impact Assessment
Tree Survey
Arboricultural Impact Assessment
Tree Survey
Arboricultural Impact Assessment - Part 1
Tree Survey
Arboricultural Impact Assessment - Part 2
Tree Survey
Arboricultural Impact Assessment - Part 3
Tree Survey
Arboricultural Impact Assessment - Part 4
Tree Survey
Arboricultural Impact Assessment Part 1
Tree Survey
Arboricultural Impact Assessment Part 2
Tree Survey
Arboricultural Impact Assessment Part 3
Tree Survey
Arboricultural Impact Assessment Part 4
Tree Survey
Archaeological Assessment
Archaeological Assessment
Auckley Parish Council
Consultation Reply
Aviation Assessment
Additional Plans/Information
Bat Survey Report
Ecology Survey/Report
Biodiversity Net Gain Assessment
Biodiversity Survey and Report
Biodiversity Policy and Legislation
Biodiversity Survey and Report
BNG Report
Biodiversity Survey and Report
Breeding Bird Report
Ecology Survey/Report
CDC Drainage
Consultation Reply
CDC Education
Consultation Reply
Certificate B
Application Form (Personal Data)
Chapter 1 - Introduction
Environmental Statement
Chapter 10 - Noise
Environmental Statement
Chapter 11 - Climate Change
Environmental Statement
Chapter 12 - Socioeconomics
Environmental Statement
Chapter 13 - Summary and Residual Effects
Environmental Statement
Chapter 2 - EIA Methodology
Environmental Statement
Chapter 3 - Site Development Description
Environmental Statement
Chapter 4 - Alternatives and Design Evolution
Environmental Statement
Chapter 5 - Construction Methodology Phasing
Environmental Statement
Chapter 6 - Landscape Character and Visual Effects
Environmental Statement
Chapter 7 - Cultural Heritage and Archaeology
Environmental Statement
Chapter 8 - Ecology
Environmental Statement
Chapter 9 - Transport
Environmental Statement
Committee report being presented to 21.10.25 planning committee
Planning Committee Report
Conservation
Consultation Reply
Consultation Reply
Consultation Reply
Covering Letter
Covering Letter
Covering Letter
Covering Letter
Cultural Heritage Desk - Based Assessment
Archaeological Assessment
DAS Appendix 1 Landscape Strategy
Design and Access Statement
DAS Appendix 3 Ecological Buffers
Design and Access Statement
DAS Appendix 4 Active Travel Lighting Strategy
Design and Access Statement
Design and Access Statement AMENDED
Design and Access Statement
Designated Heritage Assets
Additional Plans/Information
Development Specification
Planning Statement
Doncaster East Internal Drainage Board
Consultation Reply
Draft s106 agreement
Section 106 Agreements
Drainage Plan
Drainage Plan
Drainage Strategy
Drainage Plan
EIA Scoping Opinion
Environmental Statement
EIA Scoping Report
Environmental Statement
Env Health
Consultation Reply
Flood Risk Assessment
Flood Risk Assessment
Framework Travel Plan
Travel Plan
Geoenvironmental Desk Study Part 1
Additional Plans/Information
Geoenvironmental Desk Study Part 2
Additional Plans/Information
Geoenvironmental Desk Study Part 3
Additional Plans/Information
Geoenvironmental Desk Study Part 4
Additional Plans/Information
Geoenvironmental Desk Study Part 5
Additional Plans/Information
Geoenvironmental Desk Study Part 6
Additional Plans/Information
Geoenvironmental Desk Study Part 7
Additional Plans/Information
Geoenvironmental Desk Study Part 8
Additional Plans/Information
Geophysical Survey Report
Archaeological Assessment
Great Crested Newt eDNA Survey Report
Ecology Survey/Report
Hedgerow Survey Report
Ecology Survey/Report
HIghways
Consultation Reply
Hurstwood ES Addendum Non-Technical Summary.
Environmental Statement
Hurstwood ES Addendum Preamble
Environmental Statement
Hurstwood ES Chapter 13A Summary and Residual Effects
Environmental Statement
Hurstwood ES Chapter 7A Cultural Heritage and Archaeology
Environmental Statement
Hurstwood ES Chapter 8A Ecology
Environmental Statement
Illustrative Masterplan
Site Plan
Indicative Phasing Plan
Proposed Plans
Landscape Character
Additional Plans/Information
Landscape Designations Plan
Additional Plans/Information
Landscape Effects Table
Additional Plans/Information
Lighting strategy
Lighting Assessment
Location of Information within the ES Required by Schedule 4 of the EIA Regulations
Environmental Statement
Location Plan
Location Plan
Location Plan
Location Plan
Location Viewpoints
Additional Plans/Information
M24014-C-035 (002)PIA DataMap
Additional Plans/Information
Minerals Policy Response
Consultation Reply
National Highways
Consultation Reply
Noise and Vibration Legislation Policy and Guidance
Noise Assessment
Non-Designated Heritage Assets
Additional Plans/Information
Non-Technical Summary
Environmental Statement
Parameter Plan - Access
Proposed Plans
Parameter Plan - Active Travel
Proposed Plans
Parameter Plan - Building Heights
Proposed Plans
Parameter Plan - Land Use and Green Infrastructure
Proposed Plans
Part 1
Statement of Community Involvement
Part 1
Design and Access Statement
Part 1
Transport Assessment
Part 1
Transport Assessment
Part 10
Transport Assessment
Part 10 - Appendix L to O
Transport Assessment
Part 11
Transport Assessment
Part 11 - Appendix P
Transport Assessment
Part 12
Transport Assessment
Part 12 - Appendix Q and R
Transport Assessment
Part 2
Statement of Community Involvement
Part 2
Design and Access Statement
Part 2
Transport Assessment
Part 2 - Figures
Transport Assessment
Part 3
Statement of Community Involvement
Part 3
Transport Assessment
Part 3 - Appendix A to B
Transport Assessment
Part 4
Statement of Community Involvement
Part 4
Transport Assessment
Part 4 - Appendix C to H
Transport Assessment
Part 5
Transport Assessment
Part 5 - Appendix I
Transport Assessment
Part 6
Transport Assessment
Part 6 - Appendix I
Transport Assessment
Part 7
Transport Assessment
Part 7 - Appendix I
Transport Assessment
Part 8
Transport Assessment
Part 8 - Appendix J
Transport Assessment
Part 9
Transport Assessment
Part 9 - Appendix K
Transport Assessment
Personal Injury Accidents Summary Table (010125 to 170325)
Additional Plans/Information
Phase 1 Eastern Access with Visibility Splays
Proposed Plans
Phase 2 Roundabout Access
Proposed Plans
Phase 2 Western Access with Visibility Splays
Proposed Plans
Phase 3 Potential Priority Access Junction
Proposed Plans
Phase 3 S278 Agreement Works Alignment
Proposed Plans
Planning and Affordable Housing Statement
Planning Statement
Planning Policy
Consultation Reply
Planning Site Notice
Planning Site Notice
Preliminary Ecological Appraisal
Ecology Survey/Report
Public Open Space
Consultation Reply
Public Rights of Way
Additional Plans/Information
Public Rights of Way
Consultation Reply
Representations
Representations
Representations
Representations
Representations
Representations
Representations
Representations
Reptile Survey Report
Ecology Survey/Report
Road Traffic Data From TTHC
Noise Assessment
Road Traffic Noise Contours
Noise Assessment
Social Infrastructure Briefing Note
Additional Plans/Information
South Yorkshire Archaeology Service
Consultation Reply
Statement of Expertise
Environmental Statement
Strategic Housing
Consultation Reply
Submission Documents
Additional Plans/Information
Sustainability and Energy Statement
Sustainability and Energy Statement
Sustainable Drainage Strategy Part 1
Drainage Plan
Sustainable Drainage Strategy Part 2
Drainage Plan
Topographical Report
Topographical Report
Town and Country Planning (Development Management Procedure) (England) Order 2015 NOTICE UNDER ARTICLE 13 OF APPLICATION FOR PLANNING PERMISSION
Additional Plans/Information
Update Statement
Planning Statement
Updated Drainage Strategy
Drainage Plan
Updated tree response
Consultation Reply
Urban Design
Consultation Reply
Urban Design
Consultation Reply
Urban Design
Consultation Reply
Urban Design
Consultation Reply
Utility Feasibility Report Part 1
Additional Plans/Information
Utility Feasibility Report Part 2
Additional Plans/Information
Utility Feasibility Report Part 3
Additional Plans/Information
Utility Feasibility Report Part 4
Additional Plans/Information
Viewpoints - Part 1
Additional Plans/Information
Viewpoints - Part 2
Additional Plans/Information
Viewpoints - Part 3
Additional Plans/Information
Viewpoints - Part 4
Additional Plans/Information
Visual Effects Table
Additional Plans/Information
Vol 1 - Main Text and Figure Contents
Environmental Statement
Vol 2 - Technical Appendices
Environmental Statement
Wider Location Plan
Location Plan
Zone of Theoretical Visibility
Additional Plans/Information