← Back to Dartford Borough Council
Status
Awaiting decision
Received
05 Aug 2025
New dwellings
n/a
What you can do
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.
Full Proposal
Reserved Matters relating to details of the layout, scale, appearance and landscaping pursuant to condition 1 of outline planning permission DA/20/00282/OUT for demolition of existing buildings and provision of a mixed use development comprising of up to 1096 sqm of commercial uses (Use Classes B1 (now within Use Class E(g)(iii) & B8) and residential/gatehouse building up to 72 sq.m (total development of up to 1,168sq.m) and associated highway alterations/improvements in Cotton Lane, including details of levels (condition 5), waste (condition 15), cycle storage (condition 18) and boundary enclosures (condition 19 ).
Documents
11.10 PART 3 APPENDIX D AND E OF 11.10 PART 1
Report
11.10 PART 7 APPENDIX F, G, H AND I OF 11.10 PART 1
Report
11.12 PART 3 APPENDIX G AND H OF 11.12 PART 1
Report
11.12 PART 4 APPENDIX H OF 11.12 PART 1
Report
AIR QUALITY ASSESSMENT 24.07.25 784-B074687
Report
APPENDIX 10.1 FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY
Report
APPENDIX 11.14 GROUND INVESTIGATION - FACTUAL REPORT
Report
APPENDIX 11.2 GROUND INVESTIGATION FACTUAL REPORT - PART 1 PHASE 1
Report
APPENDIX 11.2 GROUND INVESTIGATION FACTUAL REPORT - PART 2 PHASE 2
Report
APPENDIX 11.6 WSP CHARGE ADVICE: REVIEW OF LITTLEBROOK REMEDIATION METHOD STATEM
Report
APPENDIX 13.2 OPERATIONAL ASSESSMENT
Report
APPENDIX 14.1 NOISE TECHNICAL REPORT
Report
APPENDIX 2.1 ENVIRONMENTAL IMPACT ASSESSMENT SCOPING REPORT (MAY 2019)
Report
APPENDIX 3.1 DETAILED DESIGN PLANS
Report
APPENDIX 3.1 LANDSCAPE PLAN
Report
APPENDIX 3.1 PART 2
Report
APPENDIX 3.1 PART 4
Report
APPENDIX 8.2 LANDSCAPE EFFECTS TABLE
Report
APPENDIX 8.3 VISUAL EFFECTS TABLE
Report
APPENDIX 9.1 INFORMATION DOWNLOADED FROM MULTI-AGENCY GEOGRAPHIC INFORMATION FOR
Report
APPENDIX 9.4 REPTILE SIGHTING PLAN
Report
APPLICANT HIGHWAYS RESPONSE PT1
Report
APPLICANT HIGHWAYS RESPONSE PT2
Report
APPLICATIONFORMREDACTED
Application Form
CAR PARK MANAGEMENT PLAN - SLR
Report
CHAPTER 1 - INTRODUCTION
Report
CHAPTER 10 - WATER RESOURCE AND FLOOD RISK
Report
CHAPTER 11 - LAND CONTAMINATION
Report
CHAPTER 12 - TRANSPORT AND ACCESS
Report
CHAPTER 13 - AIR QUALITY
Report
CHAPTER 14 - NOISE AND VIBRATION
Report
CHAPTER 15 - SUMMARY AND CONCLUSIONS
Report
CHAPTER 2 - EIA METHODOLOGY
Report
CHAPTER 3 - SITE AND DEVELOPMENT DESCRIPTION
Report
CHAPTER 4 - ALTERNATIVES AND DESIGN EVOLUTIONS
Report
CHAPTER 5 - CONSTRUCTION METHODOLOGY AND PHASING
Report
CHAPTER 6 - SOCIO-ECONOMICS
Report
CHAPTER 7 - ARCHAEOLOGY
Report
CHAPTER 8 - LANDSCAPE AND VIEWS
Report
CHAPTER 9 - BIODIVERSITY
Report
DELIVERY AND SERVICE MANAGEMENT PLAN
Report
EIA STATEMENT OF CONFORMITY
Report
EIA STATEMENT OF CONFORMITY
Report
ENVIRONMENT AGENCY
Consultation Responses
ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY
Report
ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEXT AND FIGURES
Report
ENVIRONMENTAL STATEMENT VOLUME 2 TECHNICAL APPENDICES
Report
EXISTING AND PROPOSED ELEVATIONS -SMR-16-ZZ-DR-A-2004-S3-P03
Drawings
EXISTING SITE LAYOUT -SMR-16-ZZ-DR-A-2002-S3-P03
Drawings
FIGURE 3.1 PROPOSED SITE LAYOUT
Report
FIGURE 3.2 GROUND FLOOR PLANS
Report
FIGURE 3.3 BUILDING ELEVATIONS
Report
FLOOD RISK ASSESSMENT REVP02
Report
KCC HIGHWAYS
Consultation Responses
KCC HIGHWAYS
Consultation Responses
KCC SUDS
Consultation Responses
KENT FIRE BRIGADE
Consultation Responses
LOCATION PLAN -SMR-16-ZZ-DR-A-2001-S3-P04
Drawings
NATIONAL HIGHWAYS
Consultation Responses
NATIONAL HIGHWAYS
Consultation Responses
NEWSPAPER NOTICE ACTUAL
Additional Information or Correspondence
NEWSPAPER NOTICE ACTUAL
Additional Information or Correspondence
PLANNING DESIGN AND ACCESS STATEMENT (INCLUDING EIA STATEMENT OF CONFORMITY)
Report
PROPOSED LOADING LAYOUT -SMR-16-ZZ-DR-A-2003-S3-P03
Drawings
PROPOSED MSCP M0 LAYOUT -SMR-16-ZZ-DR-A-2012-S3-P02
Drawings
PROPOSED PARCEL RETURN BOX -SMR-16-ZZ-DR-A-2006-S3-P03
Drawings
PROPOSED SALLY PORT -SMR-16-ZZ-DR-A-2005-S3-P03
Drawings
PROPOSED SITE FIXTURES -SMR-16-ZZ-DR-A-2007-S3-P02
Drawings
PROPOSED SITE LAYOUT -SMR-16-ZZ-DR-A-2009-S3-P02
Drawings
PROPOSED SITE LAYOUT MSCP M0 LAYOUT -SMR-16-ZZ-DR-A-2010-S3-P02
Drawings
TOILET BLOCK DETAILS -SMR-16-ZZ-DR-A-2008-S3-P02
Drawings
TRANSPORT STATEMENT
Report