← Back to London Borough of Barnet

Status

Pending Decision
Received 17 Dec 2024
New dwellings n/a

What you can do

Take Action

Make your voice heard. Authorities need to hear from people who support new homes.

Full Proposal

Redevelopment of the site to provide a 6-storey building comprising 26 residential dwellings (Use Class C3) with car and cycle parking and associated works.

Detail pages

Documents

APPLICATION FORM - WITHOUT PERSONAL DATA
Application Form
Not downloaded · Council link
ARB IMPLICATION ASSESSMENT
Application Document
Not downloaded · Council link
ARB METHOD STATEMENT AND TREE PROTECTION PLAN
Arboricultural Report
Not downloaded · Council link
BNP PARIBAS VIABILITY REVIEW 2025
Consultee Comment
Not downloaded · Council link
BNPP BREAKEVEN APPROACH
Consultee Comment
Not downloaded · Council link
BNPP BREAKEVEN APPROACH APRIL 25
Consultee Comment
Not downloaded · Council link
COMMENT(FULL)
Public Comment
Not downloaded · Council link
COMMUNITY INFRASTRUCTURE LEVY - COMPLETED FORM
CIL Document
Not downloaded · Council link
DAYLIGHT AND SUNLIGHT REPORT
Application Document
Not downloaded · Council link
DAYLIGHT AND SUNLIGHT REPORT
Other
Not downloaded · Council link
DESIGN AND ACCESS STATEMENT
Design and Access Statement
Not downloaded · Council link
ENERGY ASSESSMENT
Application Document
Not downloaded · Council link
EXISTING SIDE
Drawing
Not downloaded · Council link
EXISTING WESTERN ELEVATION (REAR)
Drawing
Not downloaded · Council link
FIRE SAFETY STRATEGY
Application Document
Not downloaded · Council link
GA PLAN FIFTH FLOOR
Drawing
Not downloaded · Council link
H.I.A REPORT
Application Document
Not downloaded · Council link
NOISE ASSESSMENT
Application Document
Not downloaded · Council link
OVERHEATING ANALYSIS
Application Document
Not downloaded · Council link
PLANNING STATEMENT
Planning statement
Not downloaded · Council link
PRELIM ECOLOGICAL APPRAISAL
Application Document
Not downloaded · Council link
PROPOSED FRONT (EAST)
Drawing
Not downloaded · Council link
PROPOSED FRONT CONTEXT ELEVATION (EAST)
Drawing
Not downloaded · Council link
PROPOSED FRONT CONTEXT LONG ELEVATION (EAST)
Drawing
Not downloaded · Council link
PROPOSED GA PLAN GROUND FLOOR
Drawing
Not downloaded · Council link
PROPOSED GA ROOF LEVEL
Drawing
Not downloaded · Council link
PROPOSED GA SITE FIRST TO FOURTH FLOOR
Drawing
Not downloaded · Council link
PROPOSED PLANNING SCHEME AREAS
Application Document
Not downloaded · Council link
PROPOSED REAR
Drawing
Not downloaded · Council link
PROPOSED REAR CONTEXT ELEVATION (WEST)
Drawing
Not downloaded · Council link
PROPOSED SECTION AA
Drawing
Not downloaded · Council link
PROPOSED SECTION BB
Drawing
Not downloaded · Council link
PROPOSED SIDE
Drawing
Not downloaded · Council link
PROPOSED SIDE (NORTH)
Drawing
Not downloaded · Council link
PROPOSED SIDE CONTEXT ELEVATION (NORTH)
Drawing
Not downloaded · Council link
PROPOSED SIDE CONTEXT ELEVATION (SOUTH)
Drawing
Not downloaded · Council link
SAVILLS BREAKEVEN APPROACH
Application Document
Not downloaded · Council link
SUDS SUPPORTING INFORMATION
Other
Not downloaded · Council link
SUSTAINABILITY STATEMENT
Application Document
Not downloaded · Council link
THE LOCATION PLAN
Site Location Plan
Not downloaded · Council link
TRANSPORT STATEMENT
Application Document
Not downloaded · Council link
TREE PROTECTION PLAN
Drawing
Not downloaded · Council link
TREE SURVEY AND CONSTRAINTS PLAN
Application Document
Not downloaded · Council link
VIABILITY
Application Document
Not downloaded · Council link